Lifting capacity:
Primary hook: 80T
Secondary hook: 20T
Lifting capacity of the maintenance crane: 2T
Working grade: M6 (primary lifting device), M5 (secondary lifting device)
Track distance: 6m (primary lifting device), 44m (secondary lifting device)
Lifting height:
Primary lifting device: 36m
Secondary lifting device: 37m
Lifting speed:
Primary lifting device: 7/11.2m/minute
Secondary lifting device: 10/15.6m/minute
Maintenance crane: 8m/minute
Speed of the cart travel: 30m/minute
Speed of the trolley travel: 25m/minute
Speed of the maintenance speed: 20.3m/minute
Total power of the motor: 270kW
Maximum wheel load: 381kn (primary lifting device), 349kn (secondary lifting device)
Recommended steel track: 43kg/m
Power supply: 3 phases, 380V AC, 50Hz
OEM orders are welcomed
Primary hook: 80T
Secondary hook: 20T
Lifting capacity of the maintenance crane: 2T
Working grade: M6 (primary lifting device), M5 (secondary lifting device)
Track distance: 6m (primary lifting device), 44m (secondary lifting device)
Lifting height:
Primary lifting device: 36m
Secondary lifting device: 37m
Lifting speed:
Primary lifting device: 7/11.2m/minute
Secondary lifting device: 10/15.6m/minute
Maintenance crane: 8m/minute
Speed of the cart travel: 30m/minute
Speed of the trolley travel: 25m/minute
Speed of the maintenance speed: 20.3m/minute
Total power of the motor: 270kW
Maximum wheel load: 381kn (primary lifting device), 349kn (secondary lifting device)
Recommended steel track: 43kg/m
Power supply: 3 phases, 380V AC, 50Hz
OEM orders are welcomed

