Product Main

Quick Details

Brand Name: Shanxi Changda
State: Liquid Coating
Application Method: Spray Application and Screeding Application
Usage: Building Coating,Road Marking Paint
Main Raw Material: Methyl methacrylate
Model Number: II
Place of Origin: China (Mainland)
EINECS No.: ---
MF: ---
Other Names: Cold plastic road marking paint
CAS No.: ---
Retroreflective valve: >/=350 mcd(white)
Curing time:
Density (g/cm3): 2
Abrasion resistance:
Color: White/Yellow /Customize other colors

Specifications

Advantage:

*  Material from Evonik Industries;

*  Excellent brightness and night visibility;

*  Anti-crack & strong tenacity;

*  Wear resistance is 2 times better than thermoplastic marking;

*  Excellent aging resistance;

*  Environment protection,100% solid content and no volatile substances.

 

Construction mode includes spraying application and screed application and extruded application.

MMA TwoComponent Highlight Pavement Marking material MMA Cold Plastic

Contrast about the adhesive strength between glass beads and paint

 



Consumption (Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )

Surface temperature 25

Spraying application

(0.5mm-0.7mm)

Screeding application

(1.2mm-1.5mm)

Thickness

0.6mm

1.2mm

paint

1kg/

3kg/

Hardner

15g/

45g/

Primer

150g/

 

Glass beads

0.5kg/

0.5kg/

Dosage table of curing agent (Used in B component)

Paint

Hardner

Surface temperature()

Ratio of BPO

Surface dry time    (Min)

Curing time  (Min)

B component

White color

Powder

5

750g-800g

25

50

15

700g-750g

20

35

25

650g-700g

10

20

35

550g-600g

8

15

Technical Data:

Retroreflective valve:350 mcd(white)

Curing time:15minutes

Density (g/cm):2

Abrasion resistance:35mg

Color:White/Yellow /Customize other colors

 

the matters needing to attention during the construction

1. Dry & Clean & flat of road surface.

2. Damaged road should be repaired before applying.

3. Before applying,should add the hardner according to the ratio to the MMA two-component

(Component B) pavement marking paint,then stir well.

4. Avoid breathing vapors,eyes and skin should not touch the coating.

5. during Construction,eating and drinking and smoking is prohibited.

 

Attention of construction

1. Clean and dry road surface.

2. Construction environment temperature is about 10 to 40, surface temperature generally

Is above 5.

3.  the curing time depends on the consumption of curing agent & the temperature of construction

Environment,but has nothing to do with the thickness of the coating.

4.  Strictly prohibited from direct sunlight during transport and storage,stored in ventilated

and shade and dry place,the storage temperature should be controlled in 0 to 40.

5. during screeding application,it is recommended that two scraper buckets be equipped for

Continous replace