Product Main

Quick Details

Place of Origin:
Brand Name:
Model Number:

Specifications

     Baoji Thread Gages limited liability company was founded in September 2007 with a registered capital of 500 million yuan, the company's total investment of 30 million RMB, is the only one to focus on manufacturing all kinds of API ordinary gauge and a variety of the special deduction thread gauge technology-based enterprises.  
 The company currently employs more than 50 people, including three senior titles, intermediate grade 3, more than 30 skilled workers, has engaged thread gauge design, manufacturing more than twenty years of experience in senior senior technical staff, has to participate in API SPEC 7-2 , API SPEC 5B standard, GB / T 22512.2-2008 (the second part of the rotary drilling equipment, oil and gas industry: rotary stepped threaded connection processing and measurement), with API SPEC 5B version 15 2008-10-01 (casing, tubing drafting the review and processing, measurement and testing specification line pipe threads). 
The Company has API certification through the American Petroleum Institute (API SPEC 7-2-0680, API SPEC 5B-0032) is a few domestic sales of petroleum thread gauge industry have this certification, production, sales as one of professional manufacturing company.Has a perfect quality assurance system, strict scientific management system, and through domestic ISO 9001:2008-UQ090985R0 quality system certification.Proofing regulations, work rules, respectively censorship scientometric Research Institute (NIM), China Petroleum Group the OCTG Engineering Technology Research Institute (TGRC), has been unanimously praised. 

   Baoji Thread Gages limited liability company to ensure the quality of the product, the production process must follow the rules:
1, three press: according to the standard, according to the process, according to requirements;
2, three types of inspections: the management of seized three self-inspection, mutual inspection and special inspection; inspection work "three types of inspections: the first seizure, inspection and completion inspection.
3, the three no's:
Substandard raw materials are not in use;
Substandard material into the next process;
Substandard products not manufactured.
4 three persistences:
Quality problems are not identified sparing;
Responsibility for quality is not explicitly sparing;
Not implemented measures to prevent recurrence of left off.
5, the establishment of nonconforming product files, research the reason and the law of defective products, the use of the PDCA cycle (Deming cycle) to be addressed and improved.