Packaging & Delivery
Packing details: Packing with steel stainless steel and wood cases.
Delivery details: Delivery time within 40 days from Qingdao.
Trade terms:
1. Payment: By T/T or L/C
100% payment if the total amount is less than USD10,000
40% deposit and 70% balance before shipment if the total amount is more than USD10,000
2. Delivery time: 10-50 working days, subject to the capacity of the equipment
3. The terms of the delivery: FOB, CFR, CIF
4. MOQ: 1 Set
Service:
1. Providing beer production technology, brewing formula
2. Providing cost analysis, brew house design, equipment production
3. Free installation debugging and person training service.
4. Main machine guarantee for 36 months, all life service.
Basic configuration
Item(Equipment list)
|
Name
|
|
Milling System
|
01
|
Malt Miller
|
Saccharification System
|
01
|
Spiral of heavy pot (red copper)
|
02
|
Saccharification filter slot (red copper)
|
|
03
|
Saccharification wort pump
|
|
04
|
Saccharification pipelines and valves
|
|
05
|
Plate heat exchanger
|
|
06
|
Platinum resistance temperature instrument
|
|
Fermentation System
|
01
|
Fermentation tank
|
02
|
Fermentation pipelines and valves
|
|
|
03
|
Platinum resistance Temperature instrument
|
Refrigeration System
|
01
|
Glycol ice water tank
|
02
|
Refrigerating Unit
|
|
03
|
Ice water circulating pump
|
|
04
|
Ice water pipelines and valves
|
|
05
|
Platinum resistance Temperature instrument
|
|
Washing and sterilization System
|
01
|
Washing pump
|
02
|
Alkali liquor washing tank
|
|
03
|
Alkali liquor washing tank
|
|
Control System
|
01
|
Saccharification Control
|
02
|
Fermentation Control
|
|
03
|
Refrigeration Control
|
|
04
|
Washing Control
|
|
Accessory
|
01
|
&25 Hose
|
02
|
&38 Wired hose
|
|
03
|
Iron shell thermometer
|
|
04
|
Stainless steel four- way valves
|
|
05
|
Stainless steel reducing nipple
|
|
06
|
Butterfly pads
|
|
07
|
Brix plan with temperature
|
|
08
|
Inflatable head
|
|
09
|
Bad rake exit
|
|
11
|
Measuring cylinder
|
Shendong beer equipment production power and Equipment covers an area of analysis:
daily output
|
100L
|
200L
|
300L
|
500
|
1000L
|
2000L
|
unit type
|
SD100
|
SD200
|
SD300
|
SD500
|
SD1000
|
SD2000
|
floor space
|
15square
|
25square
|
35square
|
45square
|
80square
|
120square
|
power
|
8KW
|
12KW
|
20KW
|
35KW
|
35/15KW
|
65/15KW
|
Beer production period
|
8-12 days
|
8-12 days
|
8-12 days
|
8-12 days
|
8-12 days
|
8-12 days
|