Product Main

Specifications

Packaging & Delivery
Packing details: Packing with steel stainless steel and wood cases.
Delivery details: Delivery time within 40 days from Qingdao.
Trade terms:
1.        Payment: By T/T or L/C
100% payment if the total amount is less than USD10,000
40% deposit and 70% balance before shipment if the total amount is more than USD10,000
2.        Delivery time: 10-50 working days, subject to the capacity of the equipment
3.        The terms of the delivery: FOB, CFR, CIF
4.        MOQ: 1 Set
Service:
1. Providing beer production technology, brewing formula
2. Providing cost analysis, brew house design, equipment production
3. Free installation debugging and person training service. 
4. Main machine guarantee for 36 months, all life service.
Basic configuration
Item(Equipment list)
Name
Milling System
01
Malt Miller
 
 
Saccharification System
 
01
Spiral of heavy pot (red copper)
02
Saccharification filter slot (red copper)
03
Saccharification wort pump
04
Saccharification pipelines and valves
05
Plate heat exchanger
06
Platinum resistance temperature instrument
 Fermentation System
 
01
Fermentation tank
02
Fermentation pipelines and valves
 
03
Platinum resistance Temperature instrument
 
 
Refrigeration System  
01
Glycol ice water tank
02
Refrigerating Unit
03
Ice water circulating pump
04
Ice water pipelines and valves
05
Platinum resistance Temperature instrument
Washing and sterilization System
01
Washing pump
02
Alkali liquor washing tank
03
Alkali liquor washing tank
 
Control System
01
Saccharification Control
02
Fermentation Control
03
Refrigeration Control
04
Washing Control
 
Accessory
 
01
&25 Hose
02
&38 Wired hose
03
Iron shell thermometer
04
Stainless steel four- way valves
05
Stainless steel reducing nipple
06
Butterfly pads
07
Brix plan with temperature
08
Inflatable head
09
Bad rake exit
11
Measuring  cylinder