1. Rational structure in design with high strength and convenient dismounting, easy for transport and transfer..
2. Large mineral sand handling capacity up to ≤100m3/h
3. High mineral sand washing cleanliness, suitable for washing separation of placer gold with great viscosity
4. High recovery rate of gold mining; The unit has a vibrating sluice with the undersized mineral sand materials in sluice being always kept floating, which allows placer gold to have more chance to settle in cracks of felt so as to recover granular and platy gold as well as slight gold of fine grain of 0.02mm and below. As a result, the recovery rate of gold mining is expected to be very high and recovery rate of feed will be up to 95 % and above.
5. The unit with strong adaptability will have good mineral processing results for either primary ore or sand tailings in whatever geological structure and in operation at any gold mine, and also can be applied in production in the gold mines with insufficiency and shortage of water supply.
6. Less water consumption, lower energy consumption, fewer labor requirement and less investments cost.