Product Main

Specifications

Mould

Contact us with MSN email address is highly appreciated.
Packaging & Delivery
Packaging Detail: Rust-proof, each mould in one plywood box that suitable for forklift
Delivery Detail: whitin 25~60 days after mould design approval

Following customers' requirement to make the OEM mold.
Mold base: LKM C50
Inserts(cavity and core): 1.2344(quenching), 1.2738 (Nitrurado), 1.2083, 1.2311, NAK80 or you required material.
Standard parts: Punch dalian ( following HASCO STANDARD), HASCO, DME, MISUMI
Part material: ABS, ABS/PC, PA, PA66+30GF, PBT, PC, POM, PP, PE, PVC and so on
Leadtime of first samples: Around 3~6weeks depends on plastic injection moulds construction.
 
Part design analyse-->mould design-->design checking and confirmation-->mould making-->trial production-->sampling--> adjustment-->approval.
 
We have one professional engineers team to check the part design, mould design to make sure all are right before production. My engineers follow the moulds' production every week to make sure all of them are in schedule; after trial production, we will check the samples about the finishing and dimension to make sure samples are right or not and make report to our clients; we do the last final inspection on moulds before mould shipment. We are one of professional company to provide you good quality moulds with good price in time.