Product Main

Specifications

Features:
1.       Adopt gantry high rigid structure.
2.       The whole machine adopts rectangular steel tube welding, annealing, finishing.
3.       Adopt Y axis double-motor drives, which greatly improves the shock resistance of the three-axis machine, the vibration reduction is nearly ten times.
4.       Adopt dual motor drive, which reduces the skew of the gantry and improves the contour machining accuracy, the acceleration of machine can be raised 20%., equivalent to the work efficiency of 3-5 same equipments.
5.       3 axis all adopt imported linear guide rack gear.
6.       3 axis all adopt imported 20-25mm linear guide. We only use the high quality linear guide such as STAF, AMT, ABBA, HIWIN etc. Even thought these high-class parts take more costs, their high quality is the only way to realize the high accuracy and long lifetime needed by the clients.
7.       Adopt high-speed chuck and nut, applicable to high speed machining.
8.       Strict dynamic balance, meet the demand of high speed.
9.  Aligning tools automatically, easy to find the materials origin point.
10 .The materials can be moved during the whole procedure to increase processing efficiency .
 
Parameter:
Model
JD-1325
JD-1625
JD-1825
Material size
1600×3000 MM
1800×3000 MM
2000×3000 MM
Effective working area
1300×2500 MM
1600×2500 MM
1800×2500 MM
Speed
0.5 - 300mm/second
Z axis
190mm(can be customized as per clients demand)
Setting Accuracy
0.025mm
Command format
ARTISMAN GL3, HPGL 2D,3D
Memory storage
Not limited
Interface
Standard PCI
Voltage
AC 220V/50HZ
Spindle power
3200W, 4500W, inverter water cooling (other types are optional)
CNC controller power
500 W
Operating environment
Temp:5-30 degree/Humidity 35-75%(RH)
 
 
 
Machine Maintenance:
1. Everyday the continuous working time can not exceed 10 hours, ensure cooling water clean and circulating, please change the water frequently to lower temperature. If the weather temperature is too low, antifreeze fluid can be replaced.
2. Each time after using machine, operators should pay attention to clean the table timely, be sure the platform and drive system no dust. Lubricated the three axis regularly.(Attention: If the temperature is too low in winter, ball screw or guide rail shall be flushed clean by gasoline, then add oil. Otherwise, the machine won’t work caused by transmission parts obstructed.
3. Please turn off power supply before taking maintenance treatment, make sure the controller indicator light is off.
 
 
 
Warranty:
1. One year warranty period for main parts are free of charge when problems happened during the guarantee period. The consumable parts are not belonged to warranty range. Such as bits, table, data line, the outside cover and packaging.
2.The spindles warranty period is one year dated from buying.
3.We provide the consumable parts at agent price for our customers.
4.Life time free maintenance service.
5.Free training course at our factory with professional engineers.
6.24 hours online service with free technical support and different languages.