Carbon Manganese ball
Carbon ferromanganese alloy ball is a kind of new and effective material to the content of carbon increasing and manganese alloying in steel making.It is widly used in convertor and electric furnace for the carbon increasing and manganese alloying process,especially adjusting the composition of molten steel in ladle refining furnace. It has big density and made of high purity with special processing technology. It can achieve high steel, stable recovery, make the recovery of carbon is more than 85% and the manganese’s is more than 95%.It can effectively prevent the molten steel to be state peroxide.
Carbon ferromanganese alloy ball is a kind of new and effective material to the content of carbon increasing and manganese alloying in steel making.It is widly used in convertor and electric furnace for the carbon increasing and manganese alloying process,especially adjusting the composition of molten steel in ladle refining furnace. It has big density and made of high purity with special processing technology. It can achieve high steel, stable recovery, make the recovery of carbon is more than 85% and the manganese’s is more than 95%.It can effectively prevent the molten steel to be state peroxide.
The specifications of our Carbon ferromanganese alloy ball
Brand
|
C
|
Mn
|
S
|
P
|
H2O
|
content(%)
|
≤(%max)
|
||||
Carbon FeMn Alloy Ball
|
30~35
|
35~40
|
0.1
|
0.25
|
0.5
|
Size(mm)
|
Melting Point(°C)
|
Strength(kg/cm2)
|
Density(g/cm2)
|
20-50
|
1300-1350
|
70-80
|
3.5-4.0
|
Specification
1.Content:C30~35% Mn35~40%
2.Admixture:S:0.1%max P:0.25%max
3.Size:20~50mm
3.Size:20~50mm
4.Melting Point:1300~1350°C
5.Strength:70~80kg/cm2
6.Density3.5~4.0g/cm2
(All adjustable to customer's demands)
Cetification
1.ISO Approval
2.Certified as " Qualified &Reliable " manufacturer by CIQ
3.Mill's test report as each 1 MT p.p bag by CIQ
About Sample
In order to help you know our products better, our factory would like to offer free sample of 1kg by express air currier on the condition of mutual communication .
Production Lead Time &Shippment
1.Prompt producing after order,with 20tons capability/a day.
2.Shipment within 5 working days after production.(ship to Korea&Japan about two days;ship to Brazil(North America) about 35 days).