Condition: | New |
---|---|
Type: | paper machine |
Computerized: | Yes |
Place of Origin: | China (Mainland) |
Brand Name: | Dingchen |
Model Number: | 1575mm |
Voltage: | 380v-480v |
Power(W): | |
Dimension(L*W*H): | |
Weight: | |
Certification: | ISO |
Warranty: | 1 year |
After-sales Service Provided: | Engineers available to service machinery overseas |
Quick Details
Specifications
1575mm 3tons per day tissue paper production line
I. Technical parameters
1. Output paper: |
tissue paper |
2. Raw material: |
recycled paper |
3. Capacity: |
3 tons per day |
4. Net paper width: |
1600mm |
5. Paper weight: |
14-19g/m2 |
6. Design working speed |
: 150m/min |
7. Working speed: |
50-110m/min |
8. Rail gauge: |
2400mm |
9. Width of copper cylinder: |
1950mm |
10. Drive way: |
A/C frequency converter speed adjusting, section drive. |
II. Main structure with spec
1. Cylinder mold part
Ф1500mm×1950mm stainless steel cylinder mold 1 pc, Ф400mm×1450mm couch roll 1 pc, rubber hardness 38℃±2.
2. Dryer section part
Ф2000mm×1950mm alloy dryer cylinder 1 pc , Ф400mm×1950mm touch roll 1 pc, rubber hardness 90℃±2, double layer exhaust hood, pneumatic loading device.
3. Winding part
Ф700mm×1950mm winding cylinder 1 pc, 250 speed reducer 1 set
4. Rewinding, cutting and finishing part
1575mm rewinding machine with embossing & perforating 1 set
Tissue paper cutting machine 1 set
Plastic bags sealing machine 1 set
company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate
Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie
The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation