Product Main

Quick Details

Condition: New
Type: paper machine
Computerized: Yes
Place of Origin: China (Mainland)
Brand Name: Dingchen
Model Number: 1575mm
Voltage: 380v-480v
Power(W):
Dimension(L*W*H):
Weight:
Certification: ISO
Warranty: 1 year
After-sales Service Provided: Engineers available to service machinery overseas

Specifications

1575mm 3tons per day tissue paper production line


I. Technical parameters                          

1. Output paper:

tissue paper                        

2. Raw material:

recycled paper 

3. Capacity:

tons per day 

4. Net paper width:

1600mm 

5. Paper weight:

 14-19g/m2

6. Design working speed

:  150m/min

7. Working speed:

50-110m/min

8. Rail gauge:

2400mm 

9. Width of copper cylinder:

1950mm 

10. Drive way:

 A/C frequency converter speed adjusting, section drive.


II. Main structure with spec

1. Cylinder mold part

Ф1500mm×1950mm stainless steel cylinder mold 1 pc, Ф400mm×1450mm couch roll 1 pc, rubber hardness 38℃±2.


2. Dryer section part

Ф2000mm×1950mm alloy dryer cylinder 1 pc , Ф400mm×1950mm touch roll 1 pc, rubber hardness 90℃±2, double layer exhaust hood, pneumatic loading device.


3. Winding part

Ф700mm×1950mm winding cylinder 1 pc, 250 speed reducer 1 set


4. Rewinding, cutting and finishing part

1575mm rewinding machine with embossing & perforating 1 set

Tissue paper cutting machine 1 set

Plastic bags sealing machine 1 set



company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate 


Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie



The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation