Condition: | New |
---|---|
Type: | paper machine |
Computerized: | Yes |
Place of Origin: | China (Mainland) |
Brand Name: | Dingchen |
Model Number: | 1760mm |
Voltage: | 380v-480v |
Power(W): | |
Dimension(L*W*H): | |
Weight: | |
Certification: | ISO |
Warranty: | 1 year |
After-sales Service Provided: | Engineers available to service machinery overseas |
Quick Details
Specifications
1760mm high speed toilet tissue paper production line
Technical data:
Raw material: wood pulp
Output paper: High grade toilet paper
grammage: 13—30g/m2
Net paper width: 1760mm
Wire width: 2200mm
Capacity: 5T/D
Working speed: 150m/min
Rail gauge:2900mm
Drive way: AC frequency conversion speed, section drive.
company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate
Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie
The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation
company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate
Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie
The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation