Product Main

Quick Details

Condition: New
Type: paper machine
Computerized: Yes
Place of Origin: China (Mainland)
Brand Name: Dingchen
Model Number: 2880mm
Voltage: 380v-480v
Power(W):
Dimension(L*W*H):
Weight:
Certification: ISO
Warranty: 1 year
After-sales Service Provided: Engineers available to service machinery overseas

Specifications

2880mm high speed tissue paper making machine

Ⅰ.Technical parameter:
1.raw material: 100%recycle paper 
2.Output paper:toilet  tissue paper;
3.paper weight: 14-40g/㎡;
4.Net paper width: 2800mm;
5. width of cylinder mould: 3300mm;
6.Capacity: 10 ton per day;
7.Working speed: 150-200m/min;
8.Rail gauge: 3900mm;
9.Drive: Alternating current ,frequency converter, speed control ,section drive ;

Ⅱ.Structure and characteristics: 
1. Cylinder section: one stainless-steel plate type cylinder mould(Φ1800mm×3300mm). one Sealed pressure cylinder vat. One couch roll (Φ500mm×3300mm), coated by rubber,rubber hardness HS-38℃±2.
2. Dryer section: one dryer can (Φ3000mm×3300mm), one touch roll(Φ600mm×3300mm), pneumatic loading device. Coated by rubber,Rubber hardness HS-90℃±2, dryer can equipped with one set of Double layer exhaust hood.
3. winding section: one sweat cylinder (Φ1000mm×3300mm),winding paper on sweat cylinder.
4. Rewinding and cutting section: equipped with 2880mm rewinding & perforating machine,
5. drive & Control section: Alternating current ,frequency converter,speed control ,section drive ;

company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate 


Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie

  contact & negotiate!!!


The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation