| CAS No.: | |
|---|---|
| Other Names: | |
| MF: | |
| EINECS No.: | |
| Place of Origin: | |
| Classification: | |
| Main Raw Material: | |
| Usage: | |
| Brand Name: | |
| Model Number: |
Quick Details
Specifications
Product characteristics:
·High Strength of growth and high efficiency;
·Acid and alkali-resistance, low temperature resistant, and ageing-resistant;
·Good performance in heat-resistant, no creep deformation·Good performance in anti-welding and fire retardant in normal temperature;
·Acid and alkali-resistance, low temperature resistant, and ageing-resistant;
·Good performance in heat-resistant, no creep deformation·Good performance in anti-welding and fire retardant in normal temperature;
·Good performance in quake-resistant
Range of application
·Building structure reinforcement;
·Building frame bar planting;
·Bridge extension and reinforcement;
·Building structure reinforcement;
·Building frame bar planting;
·Bridge extension and reinforcement;
·Concrete pavement repair;
·Tunnel lines fixing;
·Bar planting of shear wall
·Tunnel lines fixing;
·Bar planting of shear wall
Glue dosing proportion:
Dosing proportion of A and B is B
Dosing proportion of A and B is B
A: B=20:1
Method of operation:
·Select drilling bit to drill according to the specification of reinforcing steel bar·Thoroughly clean the drilling hole;
· Take a little glue from A and B, then mix and stir in proportion to have a test. Master the gel time; , and refer to Technical Parameters Table for the depth of drilling;
·Select drilling bit to drill according to the specification of reinforcing steel bar·Thoroughly clean the drilling hole;
· Take a little glue from A and B, then mix and stir in proportion to have a test. Master the gel time; , and refer to Technical Parameters Table for the depth of drilling;
·Match the glue of A and B according to the gelation time. Stir well and then quickly fill into the drilling hole;
·Insert the rust cleaning steel bar into the drilling hole;
·After the completion of solidification, it can be fixed.
Gelation time table
|
Temperature of base material (℃)
|
Gelation time(min)
|
Bearing time(h)
|
|
-5~0
|
25~35
|
6
|
|
0~10
|
12~20
|
3
|
|
10~20
|
10~20
|
2
|
|
≥20
|
10~15
|
1
|
Technical parameters
|
Class of steel bar
|
Diameter of steel bar (mm)
|
Diameter of Drilling hole (mm)
|
Anchoring depth (mm)
|
Holes per kg
|
Designed tension (KN)
|
Average tensile resistance (KN)
|
|
Ⅰ
|
6
|
10
|
≥80
|
25
|
5.9
|
6.6
|
|
Ⅰ
|
8
|
12
|
≥120
|
|
10.5
|
11.8
|
|
Ⅰ
|
10
|
14
|
≥150
|
|
16.5
|
18.5
|
|
Ⅰ
|
12
|
16
|
≥180
|
14
|
23.7
|
26.5
|
|
Ⅱ
|
10
|
14
|
≥140
|
|
23.5
|
26.5
|
|
Ⅱ
|
12
|
16
|
≥160
|
15
|
33.9
|
37.9
|
|
Ⅱ
|
14
|
18
|
≥190
|
|
46.2
|
51.5
|
|
Ⅱ
|
16
|
20
|
≥220
|
7
|
60.3
|
67.3
|
|
Ⅱ
|
18
|
22
|
≥270
|
|
76.3
|
85.2
|
|
Ⅱ
|
20
|
25
|
≥300
|
3
|
94.2
|
105.2
|
|
Ⅱ
|
22
|
28
|
≥330
|
|
113.9
|
127.3
|
|
Ⅱ
|
25
|
32
|
≥380
|
2
|
147.2
|
164.4
|
|
Ⅱ
|
28
|
35
|
≥480
|
|
184.6
|
206.1
|
|
Ⅱ
|
30
|
38
|
≥590
|
1
|
211.9
|
236.7
|
|
Ⅱ
|
32
|
40
|
≥650
|
|
241.1
|
269.0
|
Note: base material is C30, and the steel bar is national standards rebar.
|
Appearance
|
Pressive strength
|
shearing strength
|
Adhesive strength
|
Vibration fatigue
|
Storage time<25℃) (
|
|
Brown sticky
|
≥60MPa
|
≥30MPa
|
Glue/ round steela≥7MPa
Glue/rebar≥16MP |
800(10000 times)
|
6 months
|
Operation process
Construction points of implanting steel bar and screw
·Drilling: position drilling according to technical specification
·Clearing: clear the drilling hole with compressed air and brushes.
·Matching glue: take out glues of Group A and Group B, and stir well with special tools.
·Injecting glue
Notice
· Take a little glue from A and B, then mix and stir in proportion to have a test. Master the gel time to adjust installation time.
·Stir well. Thoroughly clean the drilling hole. Don't touch the rod before solidification.
·Wear protection articles of gloves, masks, goggles, helmets before construction.
·Spattering to skin or clothes can be washed with acetone and cleaned with water.
Packing specifications
·The product is packed with plastic bucket; glue and solidifying material are packed in the same bucket
·The package specification has two kinds: 15kg/group and 5kg/group
Transportation & storage
Transportation & storage
·It is not dangerous and should be transported as common chemical building materials
·It should not be exposed in sunlight, caught in the rain, reversed and its package should not be damaged.
·The product should be kept in cool (5~25℃) and dry storeroom and the storage period is 6 months.

