Minimum Order Quantity: 10 Set/Sets
Packaging Detail: Plastic bag and Carton or customerized
Delivery Detail: 1 ~ 7days after confirmation
1.Waterproof 144 core fiber optic splice
2,Capacity:144
3,Aerial-hanging,wall-mounting,direct-bury
4,ISO9001,ISO14001,TL
GJS30-5 144 core fiber optic splice closure with 2 in and 2 out is widely used in straight-through and branching application, and it’s suitable for aerial, duct wall-mounted and direct-buried. This type of fiber optical splice closure is made in super engineering material and stuffed with seal material inside, the external accessories and fastening pieces are made in high-quality stainless steel and it can be reused.
5. Closure body is made by Super ABS material, and the bolt was made in stainless steel
Fiber optical cable diameter(mm)
|
φ10~φ22
|
Max in and out cable No.
|
Two in and two out
|
Fiber melting No.
|
Single core:1~12 cores(can be extend to 16 cores);Ribbon beam :24 cores
|
Nestification way of the fiber melting spray
|
Hanging and page turning
|
Max fiber melting spray No
|
6
|
Max capacity
|
Single-core :72cores ;Ribbon beam :144cores
|
Sealing way
|
Mechanical Seals
|
Sealing tape
|
Unvulcanized self-adhesive sealing tape
|
Item
|
Quantity
|
Comments
|
Heat –shrinkable Protective Tube
|
Same as the core No.
|
A special requirement about the conventional heat shrink tubing with core and the ribbon optical fiber cable should be told or prepared by yourself |
Self –adhesive Sealing Tape
|
2
|
|
Insulating tape
|
1 Roll
|
|
Nylon cable ties
|
4×fiber melting spray No.
|
|
Sealant Stoppers
|
8
|
|
Closure of the inlet and outlet
|
2
|
|
Stainless steel hooks
|
2
|
|
Inner hexagon spanner
|
1
|
Inside package size(mm)
|
Inside package weight(Kg)
|
Outside package size(mm)
|
Outside package weight(Kg)
|
Capacity(PCS)
|
670X200X125
|
2.6
|
680X410X385
|
16
|
6
|
Open the closure→fix the cable and check its length in the closure→strip off the cable and cable jacket→seek out the cable cores and get preparation for cable fixation→fix the strengthen cores and reorganize the extra cores→fix the cable an splice the cable→arrange the splice protective tube and fiber→complete inspection→install the dome.