Centrifugal Wet Spun pipe Making Machine
1) pipe diameter: 200-2000mm
2) Pipe length: 1000-4000mm
3) Pipe Joint: Flush joint ,Rubber Ring Joint
4) Pipe Standards: European Standards or ASTM
First, This is the earliest technology to make reinforced concrete pipes, it use the centrifugal force produced by high speed rotation of the mould. To make solid of the concrete, during the production, Feed the wet concrete by feeding machine, and please notice to use a long stick long as the mould, to ensure that the concrete is distributing evenly around the mould.
Second, after finish feeding concrete usually will let the mould running at a higher speed for 3-5 mins, when seeing the inner wall looks smooth, then stop the machine. We can use gantry crane to lift up the mould to the curing tank, after steam curing for at least 3-5 hours, the mould can be taken off. Then the pipe is done, if find the pipe with some little defect, workers can repair it with some concrete.
At last, the pipes is curing by normal temperature for several hours, they can be used for culverts, drainage, bridge ...And the mould can be used for the next cycle of production.
if you are interested, dont hesitate to contact with us!
1) pipe diameter: 200-2000mm
2) Pipe length: 1000-4000mm
3) Pipe Joint: Flush joint ,Rubber Ring Joint
4) Pipe Standards: European Standards or ASTM
First, This is the earliest technology to make reinforced concrete pipes, it use the centrifugal force produced by high speed rotation of the mould. To make solid of the concrete, during the production, Feed the wet concrete by feeding machine, and please notice to use a long stick long as the mould, to ensure that the concrete is distributing evenly around the mould.
Second, after finish feeding concrete usually will let the mould running at a higher speed for 3-5 mins, when seeing the inner wall looks smooth, then stop the machine. We can use gantry crane to lift up the mould to the curing tank, after steam curing for at least 3-5 hours, the mould can be taken off. Then the pipe is done, if find the pipe with some little defect, workers can repair it with some concrete.
At last, the pipes is curing by normal temperature for several hours, they can be used for culverts, drainage, bridge ...And the mould can be used for the next cycle of production.
if you are interested, dont hesitate to contact with us!