Cooling systems decides oil output. There are two steps for cooling. Cooling pipe is the first step. The second is condenser. We have three condensers. And there are 57 pipes in one condenser. Diameter is 48mm for one small pipe. The heat exchanging area is about 13square meters for one condenser. So the total cooling area is about 40 square meters, which will guarantee you a high oil yield.
5. It is dangerous to burning exhaust gas (C1 to C4). In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production.
Technical parameter of DOING Pyrolysis Equipment
|
||||
|
Items
|
Contents
|
||
1
|
Equipment type
|
DY-1-6
|
DY-1-8
|
DY-1-10
|
2
|
Raw material
|
tires/Plastic
|
tires/Plastic
|
tires/Plastic
|
3
|
Structural form
|
Horizontal rotation
|
Horizontal rotation
|
Horizontal rotation
|
4
|
24-hour Capacity
|
6 ton
|
8 ton
|
10 ton
|
5
|
Oil yield
|
2.7ton
|
3.6 ton
|
4.5 ton
|
6
|
Operating pressure
|
Normal
|
Normal
|
Normal
|
7
|
Material of
Reactor
|
Q245R
|
Q245R
|
Q245R
|
8
|
Thickness of
Reactor
|
14mm
|
14mm
|
16mm
|
9
|
Rotate speed of
Reactor
|
0.4turn/minute
|
0.4turn/minute
|
0.4turn/minute
|
10
|
Total power
|
19.5KW
|
19.5KW
|
19.5KW
|
11
|
Mode of cooling
|
Water cooling
|
Water cooling
|
Water cooling
|
12
|
Cooling area of
condenser
|
40sqm
|
40sqm
|
65sqm
|
13
|
Kind of transmission
|
Internal gear drive
|
Internal gear drive
|
Internal gear drive
|
14
|
Noise dB(A)
|
≤85
|
≤85
|
≤85
|
15
|
Size of Reactor(D×L)
|
2200×6000
|
2200×6600
|
2600×6600
|
16
|
Working form
|
Intermittent operation
|
Intermittent operation
|
Intermittent operation
|
17
|
Delivery time
|
20days
|
20days
|
20days
|
18
|
Weight
|
25T
|
30T
|
35T
|