Product Main

Specifications

Application fields:
It’s widely used in lime factory production line, iron and steel works, desulfurization, sewage treatment as well as high quality hydrated lime making.
Qualification and working principle:
Controlling the quicklime’s reaction time (8-15 minutes) in the container and fully hydrated the quicklime.
Make full use of the heat generated during the reaction time.
Raise the inner temperature to 60℃ by 3-5 minutes and make the quicklime fully hydrated.
Process of material feeding control
Scientific distribution of water consumption
Dust removal
Meet your requirements for different purity of lime emulsion.