Product Main

Quick Details

material: stainless steel/bearing steel
Color: Natural
Used for: Machinery, household appliances
Feature: low noise and low libration
Price: Distributors price
Payment: T/T, Western Union ,paypal
Service: OEM /After-Sales Service
Package: Industrial Exporting Packing

Specifications

6207ZZ stainless steel bearing  miniature deep groove ball bearing with high quality       
 
Product Specification
  Terms of deal  
Place of Origin Guangdong, China Packaging Details: Inner PE polybag and Outer export carton
Brand Name Yaqin Industrial packaging (about 15kgs each carton size:32.5X17.5X15.5cm )
Model Number 6207Z   As the clients' requirement
Sizes(mm) 35*72*17 Certification: ISO9001/CE/ROHS
Material Bearing Steel Shiping Terms:  
Unit Weight(g) 0.11 Shiping ways By Air/by Sea
Seals Type ZZ Port Shenzhen-China
Colour Natural  Lead Time 35 Days After Deposit
Load Capacity   Payment Terms: TT/LC/Western Union/Paypal
 
 Product Features:
 
1. able to carry high loads 
2. with carbon steel ball bearing 
3. with a high load-bearing capacity
4. more quietly than metal roller bearings
5. low noise, stable performance and durable 
6. able to work in sub-zero temperatures and have low rolling resistance
7. suitable for countless applications: sliding doors, windows and other furnitures

Our Advantage:
1.Small order accepted,if we have stock.
2.OEM offered: technical drawings or samples welcomed.
3.Popular in the world: High quality, competitive price, On time delivery.
4.Professional supplier:over 10 years in precision bearing,rollers,pulleys.
 
Our Service:
 
Customer service:
Any questions to be sent will get response within 24 hours.
           
Lead Time:
Sample Lead-times: generally 7 workdays.
Production Lead-times: 35 workdays after getting your deposit.
 
Transit time:
For small weight or Urgent, goods will be sent by Express DHL/FedEX/UPS/TNT/EMS
For max production,goods will be shipped by sea/by air.
According to client’s requirements.
 
After-sales service:
Before shipment ,products will be strictly inspection on our factory QC Process System.Just in case,
there is abnormal.Please contact us at first time, Customer Complaint handling procedure will be boot
 at once.Implementation of the scheme will be come out within 48 hours.We will negotiate with 
customer to find a reasonable way to resolve and compensate.