Name: | Portable Cryolipolysis Machine |
---|---|
Handle: | One Cryolipolysis Handle |
Power: | 500W |
Temperature: | 0,-5,-10 Degree |
Package Size: | 80*50*45cm |
Quick Details
Specifications
1: Factory direct supplier-- HKS201B Cryolipolysis
Cryolipolysis Information:
principle
|
*Controlled cooling to reduce the temperature off at cells and melt fat without cause scar tissue or skin
|
application
|
*Cool-suclpting liposuction
*Fat freeze fat reducing
*Weight loose
|
Handle
|
*1handle
*one for body
|
voltage
|
*AC110V/220V
|
power
|
*500w
|
screen
|
*8.0 inch touch screen
|
cooling device output temperature
|
*0, -5, -10° C
|
cooling device output pressure
|
*0-100KPa
|
cooling liquid
|
*pure water
|
default time
|
*1-60min
|
ambient temperature
|
*5° C-+40° C
|
relative humidity
|
*≤ 80%
|
carton size
|
*110*65*65cm
|
atmospheric pressure
|
*80KPa-106KPa
|
G/w
|
*35KG
|
warranty time
|
*Three year
|
delivery time
|
*5-7days after received payment
|
terms of payment
|
*T/T, Wesern Union, Paypal
|
MOQ
|
*1 set
|
Free part
|
*funnel, Antifreeze membrane
|
2: Our Cryolipolysis Advantage:
*With six Diode Laser In The Handle, Enhance The Effect For Loose Weight
*Free 10 Piece Antifreeze Membrane, The Price 4USD/Piece
*Whole ABS Plastic Mould
3: Cryolipolysis Warranty:
*3years free warranty for replace the parts
*Only in Frist year, RUIPU MEDICAL offer the express charge for shipment the parts.
*Online instruct
*Wholelife Service
*Only in Frist year, RUIPU MEDICAL offer the express charge for shipment the parts.
*Online instruct
*Wholelife Service
4: Cryolipolysis Payment Terms:
*T/T or Western Union
5: Cryolipolysis Shipment Method:
This unit will be shipped from the manufacturer warehouse overseas.
** Ship by EMS Express to door need 4-5days
*Ship by Express to door need 4-5days. (DHL. TNT. UPS. FEDEX. EMS)
*Ship by Normal air to airport need 5-7days.
*Ship by sea from Ningbo port need 30-40days.
*Ship by Express to door need 4-5days. (DHL. TNT. UPS. FEDEX. EMS)
*Ship by Normal air to airport need 5-7days.
*Ship by sea from Ningbo port need 30-40days.