Product Main

Quick Details

Place of Origin: China (Mainland)
Brand Name: ANSUN
Model Number: AM40-1000
Nominal working voltage: 1000V DC
Nominal discharge current: 20KA
Max discharge current: 40KA
Dimension: 90*54*69mm

Specifications

Safety precautions:

a)   When the solar photovoltaic SPD is installed in final system, it must achieve all the requirements of GB4943 (EN60950, IEC60950) standard;

b)   The equipment has to be installed by authorized professional person, before installation, to cut off power supply, and prohibit hot-line work from accidents

 

Application

AM type DC photovoltaic series power SPD is often used to prevent over-voltage and transient over-voltage from damaging DC power system and equipments, especially in photovoltaic solar power system.

 

Features:

1)  Temperature control circuit break technology, built-in over-current protection circuit, to completely keep away from fire disaster

2)  International famous components and advanced manufacturing technique

3)  Big discharger current capacity, low residual voltage

4)  Remote alarm connect point (optional)  

5)  Clear and intuitive working condition

6)  Easy installation and maintain

7)  Exquisite process, can work under the hostile environment for a long time, like acid, alkali, dust, salt fog, wet, etc

 

Specification

 

Model

AM40-1000

Max continuous operating voltage(Uc)

        1000VDC         

Nominal discharge current(kA)

20KA

Max discharge current(kA)

40kA

Protected level

3200V

Response time

≤25ns

flameretardantrating(UL94)

V0

Protection Level

IP20

Dimension(mm)

90*54*69mm

Connecting diameter(mm2)

10mm2above

Working conditions

Temperature:40~+85℃; Relative humidity:≤95(25); Elevation≤3km

Note: For latest information, please contact ANSUN company

 

Product installation diagram

Installation

1)  35mm slide guide installation way

2)  Connect +/- and ground terminal of power system to +/- and ground terminal of SPD, then screw up the bolts

3)  ground line of SPD to lightning protection system ground device

4)  After wiring, please check it until everything is going well, to put into operation.