Product Main

Quick Details

Place of Origin: China (Mainland)
Brand Name: Golden Deer
Model Number: GX-PUSL
Air pressure: 0.7Mpa (for buyer to prepare)
Feature: Automatic
Installed power: 200Kw
PLC: Siemens/Mitsubishi
Power required: 380V/3phase/50Hz
Pressure for foaming: 150-200 bar
Total length: about 140m
Total weight: 150 tons
Working speed: 3-8m/min (adjustable)

Specifications

Product Description

1  The equipment is accurate and durable.
2  The tape mechanism has a tension control device, enabling the overlay material evenly into the mould, to make sure the piece has a smooth surface.
3  The side block and adhesive tape recirculation device can guarantee the sealing of the piece and its demoulding.
4  The double-crawler laminating system is of pressure proof, and can achieve a continuously automatic production and limit the foaming material within the

mould, ensuring a stable feature in product size.
5 The following conveying and cutting systems can work simultaneously to produce plates of any length.

Products specification:  

Working speed: 3-8m/min (adjustable)
Total length: about 140m    
Working height: 1200mm (height of panel coming out)
Pressure for foaming: 150-200 Bar
Effective length of double belt conveyor: 24 m
Control mode: imported PLC system((Siemens/Mitsubishi)
Total power:  about 200 KW
Power required:  380V/3phase/50Hz
Control voltage: 24V / 110V/ 220v
Air pressure: 0.7Mpa (for buyer to prepare)
Panel width: 550-1200mm (according to profile requirement)
Panel thickness: 20-150mm      

Main Equipments:

Decoiler
Filming Machine
Upper Roll Forming Machine
Lower Roll Foming Machine
PU Foaming Machine
Main Heating Machine


PU Sandwich Panel Production Line
Rockwool Sandwich Panel Production Line

Brief Introduction:

1.ISO9001 & CE certification
2.20 years' experience
3.One Year warranty,lifetime service
4.Vacuum EPS Shape Molding Machine

Certifications: CE, CCC, TUV, SGS, ISO9001: 2008

Main Market: Middle East, East Europe. Africa, South America

Payment Terms: T/T, L/C, 30% T/T of total amount as advance deposit,65%T/T before shipping,5%T/T after installation.

Delvery Time: Within 5-6 months  after receiving advance payment or L/C

Any Questions Please feel free Contact with us! Look forward To Your Email.