Place of Origin: | China (Mainland) |
---|---|
Brand Name: | Ark |
Model Number: | FL |
closed cooling tower: | counter flow closed cooling tower |
Quick Details
Specifications
1. Counter flow cooling mode and efficient dehydrator are adopted. So drift
rate is very low;
2. Compared to crossflow type, it saves large space;
3.
Fully closed circulation can put an end to blocking caused by sundries;
4.
The stacking mode of building block is adopted for heat exchanger. So you can
install and dismantle layer by layer;
5. Soft water circulation is adopted so
as to avoid scale;
6. Water tank is not needed. Besides, occupied area is
small and it is convenient for changing place;
7. There is automatic digital
display and temperature control function which is energy saving and
environmental protection;
8. The operation is simple and maintenance cost is
low.
Equipment service commitment
To make the customer
feel satisfied, it is not just proving good products, but also the measures of
installation, quality tracking and maintenance in the service of Ark. The files
of customers are stored in the customer service center of Ark and Ark has the
consideration of all details for the customers to solve the troubles behind for
customers.
1. To provide operation training and equipment debugging to
customer for free, and the technical guide before the starting up and shut down
and the whole technical service and supports will be provided during the
application of equipment.
2. If there is deviation between quantity and
quality of products or technical specification and the contract, or it is
confirmed that the product is defective, the supplier will conduct the
maintenance for free or replace the defective products or parts after receiving
the notice.
3. After the equipment is put into operation, if there are
the damages of parts and quality problems occurring within the warranty period,
the supplier shall properly handle it for free to the satisfaction of customer;
if it occurs after the warranty period expired, the cost price of parts shall be
paid.
4. If there are the operations or other conditions that will affect
the normal operation of cooling tower occurring, our company will give the
response and provide the solution within 1 hour after receiving the
report.
5. The latest technology in environmental protection and energy
saving shall be provided to customer as selections for free and the software
used by equipment shall be upgraded for free within the life cycle of
equipment.
6. The supplier will be responsible for providing the free
technical training to the personnel of user, including the principles of
equipment, failure diagnose and maintenance, etc.
7. The routine
inspection and maintenance work shall be regularly provided.
8. Lifetime
service system of product and the parts will be provided with cost price after
the warranty period is expired.
9. Our company will be responsible for
the guiding of installation (mechanical connection, electrical connection,
adjustment whole equipment and test of each functions of equipment),
commissioning and trial operation of equipments as well as the site supports and
site technical training, etc.