Place of Origin: | China (Mainland) |
---|---|
Brand Name: | Zhongchuan |
Model Number: | |
Name: | ASTM A53 Carbon Steel Spiral Pipe |
Material: | Carbon Steel, Stainless Stee, Alloy Steel |
Certificate: | API |
Quick Details
Specifications
Products Information:
astm A53 carbon steel sprial pipe
1 STANDARD:ASME/ANSI GB DIN JIS EN
2 Our products :ASTM A554, ASTM A249, ASTM A269, ASTM A270, A312
3 Grades:ASTM / ASME A 53 GR. A & B, ASTM A 106 GR. A, B & C. API 5L GR. B, API 5L X 42, X 46, X 52, X 60, X 65 & X 70. ASTM / ASME A 691 GR A, B & C ,J55 ,K55,N80,N80Q,L80,P110 and so on
4 Types:Seamless Steel Pipe / ERW Steel Pipe / Sprial Steel Pipe / Alloy Steel Pipe / Anticorrosion &Insulation / Stainless Steel Pipe / OCTG Steel Pipe / Steel Square and Rectangular and so on
5 Length: 5.8--12 Meters, or as customer's' request
6 Application:1). Low and middle pressure fluid transportation pipeline2). Boiler Pipe,3). Petroleum and natural gas industry,
4). Chemistry industry,5). Electric industry,6). Drainage project,7). City construction,8). Low and middle pressure boiler pipeline
8 Delivery Time:15--45 days after the order confirmed
9,Payment Terms:(1) T/T:30%T/T advance,70% balance copy of B/L.(2) L/C:at sight (3)T/T and L/C:40%T/T advance,60% L/C at sight (4) Western Union
astm A53 carbon steel sprial pipe
1 STANDARD:ASME/ANSI GB DIN JIS EN
2 Our products :ASTM A554, ASTM A249, ASTM A269, ASTM A270, A312
3 Grades:ASTM / ASME A 53 GR. A & B, ASTM A 106 GR. A, B & C. API 5L GR. B, API 5L X 42, X 46, X 52, X 60, X 65 & X 70. ASTM / ASME A 691 GR A, B & C ,J55 ,K55,N80,N80Q,L80,P110 and so on
4 Types:Seamless Steel Pipe / ERW Steel Pipe / Sprial Steel Pipe / Alloy Steel Pipe / Anticorrosion &Insulation / Stainless Steel Pipe / OCTG Steel Pipe / Steel Square and Rectangular and so on
5 Length: 5.8--12 Meters, or as customer's' request
6 Application:1). Low and middle pressure fluid transportation pipeline2). Boiler Pipe,3). Petroleum and natural gas industry,
4). Chemistry industry,5). Electric industry,6). Drainage project,7). City construction,8). Low and middle pressure boiler pipeline
8 Delivery Time:15--45 days after the order confirmed
9,Payment Terms:(1) T/T:30%T/T advance,70% balance copy of B/L.(2) L/C:at sight (3)T/T and L/C:40%T/T advance,60% L/C at sight (4) Western Union