Product Main

Quick Details

Condition: New
Type: paper machine
Computerized: Yes
Place of Origin: China (Mainland)
Brand Name: dingchen
Model Number: 1880mm
Voltage: 380v-480v
Power(W):
Dimension(L*W*H):
Weight:
Certification: ISO
Warranty: 1year
After-sales Service Provided: Engineers available to service machinery overseas

Specifications

company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate 


Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie

1880mm Tissue Paper Making Solution for Capacity 5 - 6 Tons/Day         


Ⅰ.Technical parameter

1. Raw material

 wood pulp, recycled paper

2. Output paper

 High quality tissue paper 

3. Output paper weight

 15-40g/m2

4. Capacity

 5-6 tons per day

5. Cylinder mold width

 2300mm

6Net paper width

 1800mm;

  7. Working speed

 70-150m/min

  8. Designing speed

 200m/min

  9. Rail gauge

 2800mm

  10. Drive way

 Alternating current frequency converter speed control, sectional drive. 


Ⅱ. The main structure with spec


1 . Cylinder mold part

1 set of φ1500mm×2300mm×2800mm stainless steel cylinder mold, 1 set of Ф450mm×2300mm×2800mm couch roll, coated by rubber, rubber shore hardness 38℃±2.  


2. Dryer part

1 set of Ф2500mm×2300mm×2800mm dryer drum, 1 set of Ф500mm×2300mm×2800mm touch roll, rubber shore hardness 90℃±2. Pneumatic pressure device. There is double-layer dryer hood. 


3. Winding part

1 set of Ф1000mm×2300mm×2800mm winding cylinder.


4. Rewinding and cutting part

1 set of 1800 rewinding machine with embossing and perforating.  

1 set of tissue paper cutting machine. 


  contact & negotiate!!!


The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation