| Condition: | New |
|---|---|
| Place of Origin: | China (Mainland) |
| Brand Name: | Dingchen |
| Model Number: | 3600mm |
| Voltage: | 380v-480v |
| Power(W): | |
| Dimension(L*W*H): | |
| Weight: | |
| Certification: | |
| Warranty: | 1 year |
| After-sales Service Provided: | Engineers available to service machinery overseas |
Quick Details
Specifications
3600mm Kraft Liner Paper Making Machine With 120T/D
Ⅰ.Technical parameter
1. Raw material: recycled paper
2. Output paper: kraft liner paper
3. Output paper weight: 110-180g/m2
4. Capacity: 120-140T/D
5. Wire width: 4000mm
6. Net paper width: 3600mm
7. Working speed: 200-240m/min
8. Designing speed: 300m/min
9. Rail gauge: 4600mm
10. Drive way: A/C inverter speed control, sectional drive.
Ⅱ. The main structure with spec
1. Wire part
20 m fourdrinier table covered with stainless steel board, head box made of (304)stainless steel. Vacuum couch roll Ф900mm×4000mm×4600mm,made by stainless steel .
2. Press part
2 sets of press rolls in large diameter. Top roll: 2 pcs of natural marble roll at Ф1350mm×4000mm×4600mm. Bottom roll: 2 pcs of rubber roll at Ф1350mm×4000mm×4600mm, rubber shore hardness 95℃±2, with pneumatic pressure device, 8 sets pneumatic felt adjusting device, and 8 sets electric felt tightening device.
3. Dryer part
26 pcs of Ф1800mm×4000mm×4600mm alloy dryer cylinder with 26pcs of blade.
1 set 3600mm sizing machine,the sizing roll.
company:
we are a professional paper machine manufacturer,here,you can get the whole production line,we promise you good quality machines cause we do only one thing---paper machine
so welcome to visit and negotiate
Perfect service:
1.technical consultation
2.detailed design of factory or workshop
3.training engineers and workers
4.supplying spare part for long time
5.installing and testing the whole production line
6.good after-sale and in-sale servcie
contact & negotiate!!!
The business process
1.send your requirements:raw material,capacity,paper grammage
2.we make the solution to you
3.come visit and negotiate
4.sign contract
5.first payment
6.production
7.pay spare money
8.delivery
9.installation ,training,test run
10.production consultlation

