Product Main

Quick Details

Place of Origin: China (Mainland)
Brand Name: ECOGRACE
Model Number:

Specifications

Coal Fired Boiler Biomass Furnace Industrial Filter Bags PPS Ryton Filter Bags High Temperature Resistant550gsm Ryton Filter Bag With Ptfe Treatment For Coal Fired Boiler Gas Filter Description:

Ryton bag filter with PTFE treatment for Coal fired boiler gas filter ,Ryton filter bag is also called PPS filter bag ,Ryton filter bag  for Coal fired boiler gas filter ,PPS filter bag,is working specially for thermal power plant coal fired boiler dust collector system ,it works in high temperature gas ,and complex chemical composition . Ryton filter bag with PTFE treatment for Coal fired boiler gas filter ,PPS filter bag.

 

Features: 190 oC of working temperature, 220oC of short-term working temperature, 285 oC of melting point. It is also available when the oxyen content is below 14%, but the operation temperature should be lowered. When there is moisture and of high abrasion, high concentration, it could be chosen.

 

ECOGRACE main products  dust filter bags including Nomex filter bag ,PPS filter bags ,P84 filter bag ,PTFE filter bags ,Acrylic filter bags ,Polyester filter bags,dust filter bag ,bag filters,dust collector bags.

 

Applications:

In  thermal power plant coal boiler, waste  incinerator, thermal  power plant of fly ash filtration of pulse clear dust collector , PPS filter bag ,Rtyon filter bag  are an ideal filtration material.

 

Specifications:

Series:

Ryton 550gsm

Material:

PPS (RYTON) 450 - 650g/sq.m needle felt

Fibre:

100% PPS / RYTON staple fibre (Toray / Toyobo, Japan original fibre, or Chinese fibre available)

Scrim:

100% PPS / RYTON staple fibre (Toray / Toyobo, Japan original fibre, or Chinese fibre available)

Weight:

400 - 650g/m2 (customized)

Finishing:

Heat setting, single side singeing, calendering (double sides finishing would be available upon request) 

Specifications:

Customized according to drawing / sample

Packaging:

Polybag in cartons

Applications:

Coal-fired power plant, waste incinteration plant, circulating fluidized bed boilers, etc.

Delivery Time:

7-45 days

Payment Terms: