Product Main

Quick Details

Place of Origin: China (Mainland)
Brand Name: JingTong
Model Number: JT0206
Other Production: Waterstop strip,Bridge Bearing,Highway expansion joint etc.
Applicable Targets: Underground Structure,Swimming Pool,Tunnels culvert etc. construction
Intensity of Pressure: 5-6Mpa,6-8Mpa,10Mpa,12Mpa,15Mpa,18Mpa
Color Classification: Black,Blue,White,Yellow etc.
Standard: High quality,Normally,GB
Width: 200-500mm
Material: Rubber,PVC etc.
Brand: JingTong
Thickness: 5-20mm

Specifications

Production Name: Construction Waterproof material rubber waterstop belt 

Rubber waterstop : rubber waterstop is a natural rubber and various synthetic rubber as the main raw material, mixed with various additives and fillers, classics plasticate, mixing, pressing molding, the varieties and specifications.

Type: 250mm*8mm*20m ,300mm*8mm*20m ,350mm*10mm*20m ,400mm*10 mm*20m 450mm*10mm*20m, 500mm*10mm*20m etc.

Material: common, high quality, national standard. User can order according to their own needs.

Scope: rubber water-stop like encounter water swelling rubber water-stop can has application to underground constructional works, dam, reservoir, swimming pools, roofing and other building materials and structures used in the deformation of the seam water-proof. When this product is mainly used for cast-in-situ concrete in construction joint and deformation joint, and become one of the basic engineering concrete structure, underground facilities, tunnels culvert, water conveyance aqueduct, retaining dam, etc., to ensure the service life of the project construction.
Construction and installation of water stop: concrete pouring process of the rubber water-stop some or all of the buried in the concrete, if there are many sharp corners in concrete stones and sharp steel head due to the tear strength of plastic and rubber, three to five times lower than the tensile strong water stop once punctured or tear, does not need much outside force gap will expand, so in the process of water stop positioning and concrete is poured concrete, attention should be paid to cast positioning method and stress, in order to avoid water-stop punctured, so in the process of water stop positioning and concrete is poured concrete, attention should be paid to cast positioning method and stress, bailey punctured, lest affect the water stop effect.

Package Detail:

Packaging Detail:in rolls then in carton or wood box, also can according to customers' request

Delivery Detail:  within 12days after receiving payment

Note the following:

1 check hose shall not long time outdoor exposure, prevent the rain, do not contact with strong polluting chemicals.

2 in the transport and construction to prevent machinery, water-stop steel damage.

3 construction process, water stop must be reliable fixation, avoid displacement occurred when pouring concrete, guarantee the water stop in the correct position in concrete.

4 fixed water-stop methods are: to use the additional reinforcement fixed; Special fixture fixed; Lead wire and fixed templates, etc., if you want to punch, only selected in the edge of the installation area, shall not damage other parts.

5 users order should be according to the engineering structure, calculation length of good product design drawings, heterotypic structure should have the drawings, will check hose connection into a whole, as far as possible in the factory for connection at the scene, can use electric heating plate vulcanizing bonding or cold bonding (rubber water-stop) or welding (plastic water-stop) method.