Place of Origin: | China (Mainland) |
---|---|
Brand Name: | PY |
Model Number: | PY-B300*84 |
Width: | 300 |
Pitch: | 84 |
Link: | 48 |
Quick Details
Specifications
Commodity: Skid Steer Loader Track(PY-B300*84)
Size:B300*84*48 Length can be adjustable
Warranty: guarantee one year under normal use
Application: mainly used in SKID STEER LOADER and other model number can be used in Snow
blower/Snowmobile, Robot, Wheelchair, (mini)Excavators, Track loaders, Pitch Paver, Agricultural
Harvester,Dumpers...etc.
Characteristics of rubber track:
1).Less damage to the ground surface
2).Low noise
3).High running speed
4).Less vibration;
5).Low ground contack specific pressure
6).High tractive force
7).Light weight
8).Easy to change
The list of model number for Skid Steer Loader Track
Quality Control:
1.Ex works Inspection
2.Products Audits/Examination(Strict inspection according to customer's request)
3.Production Procedure Audit/Examination(Entire Procedure Control)
4.Raw material Inspection/Examination;Purchased Parts Inspection(Including All Purchased Material)
Size:B300*84*48 Length can be adjustable
Warranty: guarantee one year under normal use
Application: mainly used in SKID STEER LOADER and other model number can be used in Snow
blower/Snowmobile, Robot, Wheelchair, (mini)Excavators, Track loaders, Pitch Paver, Agricultural
Harvester,Dumpers...etc.
Characteristics of rubber track:
1).Less damage to the ground surface
2).Low noise
3).High running speed
4).Less vibration;
5).Low ground contack specific pressure
6).High tractive force
7).Light weight
8).Easy to change
The list of model number for Skid Steer Loader Track
SKID STEER LODER TRACK | |
size width*pitch | link |
B180*72A | 31-43 |
B250*72A | 34-60 |
E250*72 | 34-60 |
B300*84 | 48-52 |
T300*86K | 48-52 |
B320*84 | 50-53 |
T320*86K | 48-52 |
B320*86 | 49-52 |
B400*86 | 52-55 |
B450*84 | 53-56 |
B450*86 | 52-55 |
T450*100K | 48-65 |
Quality Control:
1.Ex works Inspection
2.Products Audits/Examination(Strict inspection according to customer's request)
3.Production Procedure Audit/Examination(Entire Procedure Control)
4.Raw material Inspection/Examination;Purchased Parts Inspection(Including All Purchased Material)