Product Main

Quick Details

Place of Origin: China (Mainland)
Brand Name: AOSUA
Model Number: AB-25
Name: AOSUA Supply New 25T Small Cooling Tower
Water inlet temperature design: 37
Water outlet temperature design: 32
Wet-bulb temperature design: 28
Dry-bulb temperature design: 31.5
Fan material: ABS
Casing: F.R.P
Sprinkler head: ABS
Fill: P.V.C
Hardware: HDG Steel

Specifications

AOSUA Cooling Tower intakes the air from bottom and discharge the waste heat at the top. Since the water is traveling from top and the air passes from bottom to top, the water droplet have more direct contact time with air. The wet cooling Towers are cooled with the help of evaporating some proportionate quantity of cirulating water.

The AOSUA Cooling Tower casing is filled with Round type PVC FILLS. The rotating water distributor sprinkler is fixed in the top of the inlet pipeline and the same distributes the hot water evenly over the round Fill media. The sprinkler will be operated with self-propulsion system. The PVC Fills is corrugated with channels between each flutes to prevent the blockage and giving more and large surface area per unit volume. The cold air meets the cold water at the bottom of the infill providing maximum evaporation and heat transfer in the infill.

Name:AOSUA  Supply New 25T Small Cooling Tower
Type:AB-25      Cooling Tower
Unit:Set       Cooling Tower
Material:FRP          Cooling Tower
Usage:For air-condition, injection molding,tan, foaming, Electricity generation,steam turbine and so on.

Fan Diameter

760mm(29.9")

Motor power

550w(0.75hp)
Max outer diameter1400mm(55.1")
Tower height1960mm(77.2")
Net weight174kg
Operating weight404kg                                  Cooling Tower
Water inlet diameter80mm(3.2")
Water outlet diameter80mm(3.2")
Brand Name:Aosua
Place of rigin:Zhejiang,China
Minimum Order:1 set             Cooling Tower
Packaging Details:Factory installed with wooden case
Terms of payment:TT
Sample delivery time:4-8 days for spare parts
Supply Ability:200 sets/month
Production date:16 days after deposit