LED Light Source: | SMD2835 |
---|---|
Warranty(Years): | 3 |
Input Voltage(V): | AC85-265V |
Lamp Power(W): | 25W |
Lamp Luminous Flux(lm): | 2400 |
Lamp Luminous Efficiency(lm/w): | 100 |
CRI (Ra>): | 80 |
Color Temperature(CCT): | 2800-6500K |
Working Temperature(℃): | -20 - 50 |
Working Lifetime(Hour): | 50000 |
Lamp Body Material: | Aluminum |
IP Rating: | IP21 |
Certification: | CE,EMC,FCC,ROHS |
Place of Origin: | China (Mainland) |
Brand Name: | A2Zlight |
Model Number: | T8 |
led quantity: | 144pcs SMD2835 |
Quick Details
Specifications
1.5m 5ft smd t8 Led tube
1. Detailed Descriptions
2. Main specs & series
1) SMD 2835 series:
2) SMD 3528 Series
3) SMD 4014 Series
4) LED TUBE+Sensor Series:
3. Fetures
1.Special circuit design, each LED work separately, avoiding the single LED broken LEDS | ||||||||
to effect other LEDS | ||||||||
2. Energy saving up to more than 70% energy than normal fluorescent lamp | ||||||||
3. 3-year life span (50.000hrs) | ||||||||
4. Instant start no flickering, no humming | ||||||||
5. No lead, mercury, no RF interference |
4. Applications
1) Production line lighting in factory | |||||
2) Subway, bus, station | |||||
3) Office building, shops, shopping mall | |||||
4) School, hospital, exhibition hall | |||||
5) advertisement lighting and decoration |
5. Installations (CE Standard)
Precaution: Switch off power before doing any works.
Method A
If lighting fixture's wire connection is inductor ballast, installation as bellow:
Step 1. Remove the traditional fluorescent tube from the lighting fixture.
Step 2. Take out the inductor ballast from the lighting fixture.
Step 3. After take out the ballast, there will have two wires. One wire connects to right side and another wire connects
to left side.
Step 4. Install Led tube light into lighting fixture. Precaution: Switch off power before doing any works
Method B
If lighting fixture's wire connection is Electronic ballast, installation as bellow.
Step 1. Remove the traditional fluorescent tube from the lighting fixture.
Step 2. Take out the starter and electronic ballast from the lighting fixture.
Step 3. After take out the ballast, there will have two wires. One wire connects to right side and another wire connect
to left side.
Step 4. Install Led tube light into lighting fixture.
6. Packing