Aluminum Formwork System (GETO system) fully combined with building structure characteristics and worker construction habits and suits for home and abroad buildings.Starting from the wall panels,floor panels,columns,beams,doors,windows,stairs,support system etc. With 39 patents as the core, in the construction of the security,simplicity,efficiency,and construction of concrete surface effectetc all have improved significantly. So as to better highlight the aluminum formwork in the free plastering, verticality, flatness quality index, perception of construction quality indicator advantage. In addition, due to improving the construction speed, the number of installation workers has been reduced. With comprehensive comparison of old generation aluminum formwork system. It has the absolute competitive advantage.
Specifications
Geto Aluminum Formwork System
*Material:Aluminum
*Construction Speed:4 days/floor
*Feature:Recyclable
*High quality concrete
Specifications
*Material:Aluminum
*Construction Speed:4 days/floor
*Feature:Recyclable
*High quality concrete
Aluminum Formwork VS Timber Formwork
| Item | Unit | Aluminum Formwork | Timber Formwork |
| cycle times | Times | 150--300 | 6--8 |
| Template sets | Set | 1 | 3--4 |
| Unit price(including spare parts) | RMB/Sq.M | 1380--1500 | 100 |
| Cost of labor for installation | 23--25 | 25 | |
| Cost of auxiliary machinery | / | 2 | |
|
Residual value of formwork
|
300--400 | / | |
| High-rise of a building (30 floors) | 34--38 | 43 | |
| High-rise of a building (40 floors) | 26--29 | 43 | |
| High-rise of a building (50 floors) | 21--23 | 43 | |
| Same house type for two buildings (30 floors) | 17--19 | 43 | |
| Same house type for three buildings (30 floors) | 11--13 | 43 | |
|
Remarks: 1. It will be different ,due to its different price of commodities and cost of labor in the locality . 2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction. |
|||