Place of Origin: | China (Mainland) |
---|---|
Brand Name: | Oceana |
Model Number: | |
length: | 6-15m |
diameter: | 300-1000mm |
Quick Details
Specifications
Working procedure
1. Adding the slurry into the mould, it is driven quickly and rotated in the same speed of the machine.
Each component is separated and released under the centrifugal force. Usually the higher the slurry rotate speed, the better the slurry separating effect.
2. Centrifugal sedimentation is the use of different density of each component in the slurry,
which is rotated under the centrifugal force. To realize the liquid - solid (or liquid - liquid) separation.
3. The speed of separation is slow when the viscosity of slurry is high.
4. It is good for centrifugal sedimentation when the slurry density is different in each component.
Whole production line
The relevant equipments are, spinning machine, moulds, tensioning(stretching) machine, crane, rebar cutting machine,transferring carts, heading machine, etc.
centrifuge machine specification
A Pole / Pile Production Equipment
1 |
Mixing station |
Evenly mixing the raw material |
2 |
Feeding machine |
Feed the raw material to Mould |
3 |
Heading machine |
Heating and pressurizing the PC-Bar to forming a head |
4 |
PC bar or rebar ,PC wire cutting machine |
Auto Cutting the wire or bar according to the length require |
5 |
Tension machine |
Tension the PC-Bar or wire of the Cage |
6 |
Spinning machine |
Usually have 4-6 speed level. |
7 |
Tension parts |
Tesion for mould and steel cage. |
8 |
Curing room and cover |
C60 curing by room temperature C80 Curing by Autoclave |
9 |
Cage making table for pole Auto caging machine for pile |
Use the PC-wire or rebar to make the steel cage for pole Use the pc-bar ,wire or rebar make the steel cage for pile |
10 |
Other self- making machine |
|
FAQ :you want to set up a new factory of concrete pile or pole .pls follow below question :
1. How many poles or pile will be produced per day?how many hrs per shift and how many shifts per day?
2. do you have existing land and what size ? Actually, the land size decide the capacity.do you have enough land to meet it? If you can ,kindly send me the workshop layout and detail data.if you need us help you design the factory , we have professional engineer .
3. Concrete strength,C60(PC) or C80(PHC)?The difference is C80 pole need steam curing by autoclave, higher strength.
4.what diameter of you pile ? what length of your each pile specification ?
5.What taper ratio of your country pole standard ?same as China 1:75?pls tell me more specification of your poles ?such as length ,diameter.The mould size and price is based on it. For piles , pls tell me diameter and length is enough.
5. What is your budget??And how about automation degree?? Full-automatic need more investment.
6. Local market??Do you have done market research?If the local demand is not big, we will recommend more suitable capacity
what capacity you need ?