| Model Number: | YG6, YG8, YG6X, YG8X |
|---|---|
| Brand Name: | LIPAI |
| Place of Origin: | China (Mainland) |
| Size: | Any size |
| Sample: | 1-2 pcs available |
| Surface: | Blanks ungrounded or grinding polished |
| Service: | OEM, ODM |
| MOQ: | 5KG |
| Delivery time: | 10 days or so |
| Payment terms: | 30% deposit T/t, balance before shipment |
| Shipment: | By sea or Air |
Quick Details
Specifications
Advantage of our products:
1) Made from 100% raw virgin material
2) More than 10 years production experience
3) Advanced equipments
4) All products go through process and final inspection
5) All size available
6) Small/Trail order accepted
Products information:
Cemented carbide pellets for tube drawing, high carbon , stainless steel, brass, aluminum and so on . All major wire producer can use drawing dies . there are there drawing dies , including wire drawing dies , bar drawing dies, tube drawing dies .It is the mould of black non -ferrous , alloy wire ,sample tube.
Grade and Application recommended:
|
Grade |
Density (g/cm3) |
HRA |
T.R.S (Mpa) |
Application |
|
YG3X |
14.9 |
≥91.5 |
≥1300 |
For drawing non-ferrous metal wire and stainless steel wire etc. |
|
YG6 |
14.8 |
≥90.0 |
≥2150 |
For drawing steel wire and stainless steel wire etc. |
|
YG6X |
14.8 |
≥92.0 |
≥1860 |
For drawing nonferrous metal wire, steel wire, stainless steel wire. Good wear resistance and high toughness.. |
|
YG8 |
14.8 |
≥89.5 |
≥2320 |
For drawing steel wire, stainless steel wire. Good general performance. |
|
YG11 |
14.4 |
≥88.5 |
≥2420 |
For fabricating drawing dies of steel tubes and rods under high compressibility ratio; punching, stamping, forging tools under large stress. |
About our service
1) OEM & ODM are welcomed;
2) Customized design is available;
3) Reply your enquiry in 24 working hours;
4) Experienced staffs answer all your questions in fluent English.
Payment Terms
We accept T/T, L/C , Paypal ,Western Union ,ESCROW.
Regarding T/T payment, the customers need to pay 30% in advance; the balance will be paid off after finish hed production before shipment.
Regarding L/C payment, we just accept the irrevocable L/C, and buyer should pay all handle fee of the Ban k include our bank hand fee.

