| After-sales Service Provided: | Engineers available to service machinery overseas |
|---|---|
| Warranty: | 1 year |
| Weight: | 16 tons |
| Dimension(L*W*H): | 29 m*7 m* 5.5 m |
| Power(W): | 120kw |
| Voltage: | 380V |
| Model Number: | 1092 |
| Brand Name: | wwwcnpapermachinerycom |
| Place of Origin: | China (Mainland) |
| Processing Type: | paper making machine |
| Product Type: | Machinery for paper making |
| Condition: | New |
Quick Details
Specifications
Model. 1092mm Tissue
paper making plant
This line consists of stock preparation, Model 1092 tissue paper making machine, and boiler. This is a complete production line from the raw material (could be recycled paper and virgin pulp) to final product tissue jumbo rolls. We can also supply other tissue paper converting machines if you need make the jumbo roll to other products.
What the buyer need to prepare besides the scope of supply is the factory construction; pipes for pulp, water and steam; valves for connecting; water supply; electricity supply; raw material; chemical materials, etc.
1. Technical parameter
1.1. Output paper style: tissue paper
1.2. Raw material: recycling paper, virgin pulp.
1.3. Capacity: 1.5-2 t/d;
1.4. Net paper width: 1092mm;
1.5. Output paper weight: 18-40g/m2;
1.6. Width of cylinder mould: 1450mm;
1.7. Rail gauge: 1800mm;
1.8. Design speed: 100m/min
1.9. Working speed: 50-80m/min;
2. Stock preparation:
|
No. |
Name |
Type |
Quantity |
Motor |
|
1 |
hydrapulper |
1.5m3 |
1 |
11kw-6 |
|
2 |
High frequency vibrating screen |
0.9m2 |
1 |
2.2kw-4 |
|
3 |
pulp grinder |
380mm |
1 |
37kw-6 |
|
4 |
Vertical mixer |
|
1 |
1.5kw-4 |
|
5 |
Pulp washer |
35m3 |
1 |
3kw-4 |
|
6 |
Thruster |
500mm |
1 |
5.5kw-4 |
|
7 |
Pulp pump |
4cun |
2 |
4kw-4 |
|
8 |
Desander |
606 |
6 |
|
|
9 |
Centrifugal screen |
0.5 m2 |
1 |
7.5kw-4 |
3. Paper Making Machine:
3.1. Cylinder mould section:Ф1000mm×1450mm stainless steel cylinder mould 1set, Ф300mm×1100mm couch roll 1set,coated by rubber, rubber shore hardness 38℃±2.
3.2. Dryer section: Ф1500mm×1450mm alloy dryer can 1 set, 1group scraper knife. Ф350mm×1100mm touch roll 1set, coated by rubber, rubber shore hardness 90℃±2.Mechanical loading device.
3.3. Winding section: 1092 winding machine.
4. Boiler:
0.5T boiler, 1 set
5. Installation:
we will send our engineer to assist factory design, installation and technical training. The buyer must be responsible for the security of seller's engineer. And the buyer should bear the cost of double way international air tickets, visa, local transportation, lodging and accommodation during this period. And the buyer shall pay USD 2000/?per month.
10. Delivery time: 30 days