Processing: | Fermenting Equipment |
---|---|
After-sales Service Provided: | Engineers available to service machinery overseas |
Warranty: | 3 years from commissioning |
Certification: | CE ISO UL |
Processing: | Fermenting Equipment |
Weight: | Various in different models |
Dimension(L*W*H): | Properly according to the capacity request |
Power(W): | 15-70Kw depends on size |
Voltage: | 3phase/380(220,400,415,440)v/50 (60)Hz |
Processing Types: | Alcohol |
Model Number: | TT-1000L TT-1200L TT-1500L TT-2000L TT-2500L TT-3000L TT-3500L |
Brand Name: | Tiantai/TBE or OEM |
Place of Origin: | China (Mainland) |
Condition: | New |
Thickness of Tanks: | 3mm for interior shell,2mm for exterior shell |
Inner Polishing Precision: | 0.4 Micrometer |
Color Available: | Mirror SUS, Luxury red copper |
Controlling System: | Temperature, Pressure auto control |
Appearance: | Stainless steel or Red Copper cladding |
Heating: | Electric/Steam/Direct fired |
Heat Insulation: | Polyurethane or Rock wool with Thickness=80mm |
Accessories: | Available |
After-sales Service Provided: | Engineers available to service machinery overseas |
Application: | small brewery beer brewery plant |
Quick Details
Specifications
1.Introduction
Microbrewery or minibrewery is typically applied to breweries that are much smaller than large-scale corporate breweries and are independently owned. Such breweries are generally characterized by their emphasis on flavor and brewing technique. We offer a Microbrewery (mini brewery) with the productivity of 1000L (10 hl) to 5000L (50hl) per brew. The service includes: complete set of microbrewery equipment, installation turn key, recipes and technology of branded beers, staff training and more. Microbrewery comes complete "turnkey"
The performance of your Microbrewery (Brewery and mini brewery), if necessary, can be increased in the future.
2. Brewery Specifications
Each winemaker has his own understand when brewing beer. We are able to design the equipments
according to your personalized request. If you don't have experience in this field, you can choose our
standard solution as below:
Output/Brew |
1000L |
1200L |
1500L |
2000L |
2500L |
3000L |
3500L |
Brews/Week |
6~12 |
6~12 |
6~12 |
6~12 |
6~12 |
6~12 |
6~12 |
Output/Week |
6000~ 12000L |
7200~ 14400L |
9000~ 18000L |
12000~ 24000L |
15000~ 30000L |
18000~ 36000L |
21000~ 42000L |
Electric Supply |
3phase/380(220, 415,440)v/50 (60)Hz Single Phase/ 220(110, 240v)/50(60)Hz |
||||||
Heating Source |
Steam/Directly Fired |
||||||
Area Request |
>70M2 |
>80M2 |
>100M2 |
>120M2 |
>140M2 |
>150M2 |
>180M2 |
Brewmaster |
1 |
1 |
1 |
2 |
2 |
3 |
3 |
Note: 1hl=100liter; 1Gallon=3.7854liter; 1Barrel (BBL) =117Liter;
3. Equipments Components of Beer Brewing Plant
Equipments Request |
Components |
1. Milling System |
Malt Miller |
2. Mashing System |
Mash/Lauter Tun |
Boiler Tank |
|
Boiler |
|
Heat Exchanger |
|
Wort Pump |
|
Stiring Device (Optional) |
|
Other accessories are available: 1. Ornamental Pipe; 2. Mashing Pipeline; 3. Operating Plateform; 4. Yeast Feeder; 5. Venturi Tube; 6. Butterfly Valve DN40; 7. Butterfly Valve DN32; 8. Soft Pipe; 9. Dregs Rake; 10. Sugar Measuring Cylinder; 11. Saccharimeter; |
|
3. Fermenting System |
Fermentation Tank |
Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe; |
|
4. Cooling System |
Ice Water Tank |
Refrigeration Machine |
|
Centrifugal Pump |
|
Evaporator |
|
Ice Water Pump |
|
Relative Pipes and Valves |
|
5. CIP System |
Washing Tank |
Sterilization Tank |
|
Pump and Valve |
|
6. Filter System |
Kieselguhr Filter |
Membrane Filter |
|
Filtered Beer Tanks |
|
7. Packing System |
Fresh Keg Packing Machine |
Pop Can Packing Machine |
|
Glass Bottle Packing Machine |
|
8. Controlling System |
Mashing Control Panel |
Fermenting Control Panel |
|
Refrigerating Control Panel |
4. Our Services
a |
Free consultation service before, during, and after sales |
b |
Project planning and design services |
c |
Free debugging instruction of equipment until everything is functional |
d |
Management of equipments' long distance shipping from seller's factory to named port or station by buyer |
e |
Training of equipment maintenance and operating personally |
f |
New production techniques |
g |
Provide 36 months complete warrantee for main parts and life-time maintenance service;The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free |