Item Type: | Tube Lights |
---|---|
Light Source: | LED |
Brand Name: | Hawksky |
Place of Origin: | China (Mainland) |
Certification: | CE,RoHS |
IP Rating: | IP66 |
Lamp Body Material: | Aluminum Alloy |
Working Lifetime(Hour): | 35000 |
Working Temperature(℃): | |
Color Temperature(CCT): | Warm White |
CRI (Ra>): | 80 |
Lamp Luminous Efficiency(lm/w): | 100 |
Lamp Luminous Flux(lm): | 1500 |
Lamp Power(W): | 15 |
Input Voltage(V): | 100V-240V |
Warranty(Years): | 2 |
LED Light Source: | SMD2835 |
LED Light Source: | SMD2835 |
Warranty(Years): | 2 |
Input Voltage(V): | 100V-240V |
Lamp Power(W): | 15 |
Lamp Luminous Flux(lm): | 1500 |
Lamp Luminous Efficiency(lm/w): | 100 |
CRI (Ra>): | 80 |
Working Lifetime(Hour): | 35000 |
Certification: | CE, RoHS, UL |
Quick Details
Specifications
Quick Details
- Light Source:LED
- Item Type:Tube Lights
- LED Light Source:SMD2835
- Warranty(Years):2
- Input Voltage(V):100V-240V
- Lamp Power(W):15
- Lamp Luminous Flux(lm):1500
- Lamp Luminous Efficiency(lm/w):100
- CRI (Ra>):80
- Color Temperature(CCT):Pure White
- Working Temperature(℃):-30 - 40
- Working Lifetime(Hour):35000
- Lamp Body Material:PC
- IP Rating:IP66
- Certification:CE, RoHS, UL
- Place of Origin:Guangdong, China (Mainland)
- Brand Name:Hawksky HS-T8-0.9-72
- Model Number:T8
- product name:T8 Fluorescent Led Tube Lighting
- power:15
- type:T8 Fluorescent Led Tube Lighting
- T8 Fluorescent Led Tube Lighting Soure:SMD2835
- CCT:6000K
- Brand:Hawksky
- sample:free
- Certificate:CE RoHS UL
- Fluorescent Led Tube Lighting warranty:2 years
- OEM::accepted
T8 Fluorescent Led Tube Lighting FAQ:
Application of Led Tube with CE in China :
Led Tube for:Residential Buildings, Home,Office, Meeting Room ,School, Library,Factory, Warehouse,Hotel, Casino,Parking Garage,Hospital,Commercial Center,Supermarket,Shopping mall,anywhere you want.
Led Tube Quality Control:
100% of the lamps will be tested and keep lighting for 24 hours to test its quality reliability , and we will also test its temperature after 24 hours' lighting.
Then after it is cool we again test 100% of the lamps to see if it still work well . Each lamp should pass all these QC procedures before shipping to customer.
Led Tube Trade Terms:
1. Payment term: T/T 30% deposit after order confirmed, the balance after goods ready before shipping . or L/C , or Western Union for small amount .
2. Lead time : normally in 5~10 days after deposit received
3. Sample policy : Samples are always availble for each model . Samples can be ready in 3~7 days once payment received .
4. Shipping port: Shenzhen/Dongguan , China
Led Tube Delivery detail:
We ship goods by UPS/DHL/FEDEX/TNT express which takes 3~ 5 days to arrive, or by air cargo which takes about one week to arrive , or by sea which takes about one month to arrive , depending on your actual requirements.