Item Type: | High Bay Lights |
---|---|
Light Source: | LED |
Brand Name: | PEONYLIGHT |
Certification: | BV,C-tick,CCC,CE,CQC,EMC,Energy Star,ETL,FCC,FDA,GOST,GS,LVD,PSE,REACH,RoHS,SAA,SASO,UL,VDE |
Working Lifetime(Hour): | 50000 |
CRI (Ra>): | 82 |
Input Voltage(V): | 90-305 |
Model Number: | PL-HBL-019S4 |
Working Temperature(): | |
Lamp Luminous Efficiency(lm/w): | 130 |
Lamp Luminous Flux(lm): | 13000 |
Lamp Power(W): | 100 |
Warranty(Years): | 5 |
LED Light Source: | 3030SMD |
Quick Details
Specifications
IP65 factory price warehouse industrial 100w Linear LED high bay light
Features:
1.Owning a series patents.
2.the driver and the light source are separate, that can make the driver work under normal tem-perature, prolonging the service life of the lamp. It's esay to be installed.
3.LED chip:3030SMD
Power supply: Mean Well
Application
Apply to workshop, factory building, warehouse, highway toll stations, gas stations, supermarkets, Exhibition halls, stadiums and other places of lighting required.
Datesheet:
Power: 100W
Input Votage:AC90V-305V
Material: Aluminum + acrylic lens
IP grade:IP65 112pcs Lumileds3030smd
Beam angle: 90 145*7065*100
Light effect:100-120lm/w PF:> 0.95
CRI: Ra>70/80
CCT:2700-6500K
Life:50000H
Installation Caution:
1,Make sure the power has been turned off before maintenance. 2,Clean the lens cover regularly to maintain high transmission of light.
3,Clean up the dust from the reflector and heat sink regularly to keep sound heat dispersion. 4,Be careful not to use water or corrosive solution for cleaning, preferably with a dry cloth.
5,When install or replace power supply, directly open the back cover with a screwdriver, then re-move the power supply. There are three-core cable of AC power, red corresponds to the power of " L", blue to " N", and green or yellow to " G".
Maintenance manual:
1. Cut off pow er before maintenance 2. Clean the glass of LED street light regular to keep good light t ransmission. 3. Clean the dusk on the su rface and heat sink regular t o k eep good heat dissipation. 4. D o n ot use water or stron g corrosive liquid to clean th e lamp, d ry cloth is better. 5. R eplace LED driver: use screwdriver to open th e cover, fetch out th e driver. Y ou can see three AC wires, Match black wire with " L", white with " N", blue with " G". the red or white wire on driver is th e positive electrode, black wire is the negative elect rode. Notice, please confirm the positive and n egative electrode has n ot met extrem ely instead
FAQ
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
A: Low MOQ, 1pc for sample checking is available
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
A: Firstly let us know your requirements or application. Secondly We quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly We arrange the production.
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
A: Yes, we offer 2-5 years warranty to our products.
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%. Secondly, during the guarantee period, we will send new lights with new order for small quantity. for defective batch products, we will repair them and resend them to you or we can discuss the solution i ncluding re-call according to real situation.