Product Main

Quick Details

Feature: Bridge Crane
After-sales Service Provided: Engineers available to service machinery overseas
Warranty: 15 months
Certification: CE,ISO
Model Number: QD,LH
Brand Name: Kuangyuan
Place of Origin: China (Mainland)
Span: 10.5m-32.5m
Max. Lifting Height: No limit
Max. Lifting Load: 900t
Rated Lifting Moment: Decided by lifting capacity
Rated Loading Capacity: 10t-900t
Application: Widely used
Condition: New
Painting color: According to your demand
Working duty: A5-A8
Main electricals: Siemens/Schneider
Crane travelling limit switch: Included
Weight overload protection device: Included
Voltage lower protection device: Included
Current overload protector: Included
Delivery inspection: Available
Can be customized: Available
GB/T19001-2000 idt ISO9001:2000: Passed

Specifications

         Double Girder Overhead crane With Trolley Used In Mechanic Workshop

Brief description-double girder overhead crane with trolley:

· Double girder overhead crane with trolley is a special indispensable lifting equipment for continuous casting and continuous hot rolling production line.

· Overhead crane for steel industry are used to lift molten steel,steel coils,steel material and so on.

· It consists of bridge, crane travelling mechanism, trolley, electric equipment and electromagnetic carrier beam. Both travelling mechanism and trolley motors are special motors for canes, large starting torque and loading capacity.

· Difficult loads, reliable and versatile handling functions, high or extremely fluctuating ambient temperatures: the harsh operating conditions in foundries demand high levels of safety and functional reliability for crane systems.

· The capacity of the crane is up to 550 ton,the span is up to 31m.

Technical date-double girder overhead crane with trolley:

Double girder overhead crane with trolley:

Lifting capacity(t)

125/32

140/32

160/32

180/50

200/50

225/65

240/80

280/80

320/80

Working class

A7

Span(m)

19

19

27

28.5

28

27

22

22

24.5

Lifting height(m)

Main hook

24

22

25

27

26

32

25

29

28

Auxiliary hook

26

24

26

29

26

34

27

29

32

 

 

 

Speed

 

 

 

 

Main hook

7.6

7.8

9.8

7.5

6

11

7

12

7.5

Aux. hook

9.7

9.7

12

10

10

11

9.6

10

10

Main trolley

38

36

43.5

40

41

41

35

40

29

aux.trolley

39

37.5

43.5

38

38

39.5

38

40

39

crane

76

73

84

80

78

84

80

80

58

Max wheel load(KN)

505

535

485

525

530

550

545

735

750

Steel track recommended

QU120

Power source

380V 50HZ 3-phase A.C. (according to clients' condition)

 Introduction

Casting bridge cranes are the main handling equipment for smelting workshop of steel works. They are 

used for conveying, pouring and hot metal in smelting process. 

Construction

bridge, main crab, auxiliary crab, connecting traverse,trolley traveling mechanism and electric part.

 

Main beam

The trolley traveling mechanism and main electric equipment are installed in the girder. The girder's 

electric panel room employs rock wool for heat insulation, and has an air cooler inside. To reduce heat 

radiation of molten steel to metal structural members, a thermal baffle is set along the span direction at 

the bottom of the girder.

Drive 

The trolley traveling mechanism adopts four-corner drive.

Painting

anti-rust painting,Primer and finishing paint,yellow or red color, General thickness:about 105microns

Equipment 

The crane is equipped with a special electric scale, and there are display devices in the cab and on the

 bridge. The main hoisting mechanism is furnished with an over-speed switch.

 

Safety features -double girder overhead crane with trolley:

Safety is the most important issue for crane. To ensure the safety, the following safety devices are equiped in SGY cranes.

1.Overload protection;
2.Main lifting motor with thermal protection;
3.Hooks with latch;
4.Rubber buffers;
5.Protective earthing;Crane switch and travel end switch,
6.Emergency switch can stop all movement when any dangerous happened,
7.Sub-assemblies characteristic are tested before assembly.
8.All cranes must be preassembled and tested before leaving factory and offer the certification of test.

Order Notice of double girder overhead crane with trolley:

Pls kindly inform us the following details while you send the inquiry:

1.What is the lifting capacity?  

2.What is the span length ?(Span=distance between center of two rails)

3.What is the lifting height?(Lifting height=Distance from hook to ground)
4.What is the lifting speed?(Single speed or double speed)
5.What is the power supply in your country?
6.Is there any other special requirements?
Service we can provide
1.Payment terms is flexible,
2.Design the crane according to your technical request,
3.Delivery on time.
4.Our engineer can arrive to the installation site to help fixing the crane,
5.Diversity products,
6.Warranty:12 months.