After-sales Service Provided: | Engineers available to service machinery overseas |
---|---|
Warranty: | 1year gurantee |
Certification: | |
Brand Name: | GX brand |
Place of Origin: | China (Mainland) |
Machine Type: | Glass Tempering Furnace |
Condition: | New |
Quick Details
Specifications
1 Two sections for the Heatinq Furnace,Pre—heating Section and Heatinq Section, the heating efficiency is high and the output is 1.6 to 1.8 times more than the Single Chamber Furnace
2 There are independent heating Wires of two sections, firstly preheated and then heated.
3 The pre—heating section can improve rate of finished products by ensure heating evenly.
4 The configuration of pre—heating furnace and heating furnace are as foIlowing: Radiation heating+Radiation heatinq,Forced convection heating+Radiation heating, Forced convction heatinq+forced convection heating.
GX-SSP Series Double-chamber Glass Tempering Furnace Parameters
|
|||||
Model
|
Thickness Range(mm)
|
Max.Glass Size(mm)
|
Min.Glass Size(mm)
|
Productivity(㎡/h)
|
Installed Power(KW)
|
GX-SSP1525
|
(3)4-19
|
1500×2500
|
100×250
|
100
|
720
|
GX-SSP1536
|
(3)4-19
|
1500×3600
|
100×250
|
145
|
900
|
GX-SSP1725
|
(3.2)4-19
|
1700×2500
|
100×250
|
110
|
700
|
GX-SSP1736
|
(3.2)4-19
|
1700×3660
|
100×250
|
165
|
970
|
GX-SSP2036
|
4-19
|
2000×3660
|
100×250
|
195
|
1060
|
GX-SSP2436
|
4-19
|
2440×3660
|
100×300
|
240
|
1280
|
GX-SSP2442
|
4-19
|
2440×4200
|
100×300
|
270
|
1340
|
GX-SSP2450
|
4-19
|
2440×5000
|
100×300
|
325
|
1560
|
GX-SSP2460
|
4-19
|
2440×6000
|
100×300
|
395
|
1975
|
GX-SSP2480
|
4-19
|
2440×8000
|
100×300
|
525
|
2470
|
GX-SSP2850
|
5-19
|
2850×5000
|
200×400
|
395
|
1960
|
GX-SSP3360
|
5-19
|
3300×6000
|
200×400
|
430
|
2700
|
Remarks:
1. Models out of the above ones can be made according to client's requirements
2. The output is calculated based on 100% loading rate of 5mm float glass,and 95% finished products rate Final cases depend on actual design.
3. Gangxin Glass reserves all rights of technical innovations and eliminations.
4. The installed power and productivity may be a little different from the actural case, it is just for reference.