Product Main

Quick Details

After-sales Service Provided: Engineers available to service machinery overseas
Warranty: 12 months
Weight: to be confirmed
Dimension(L*W*H): to be confirmed
Power(W): to be confirmed
Voltage: 380/44V
Model Number: 1500-5600mm
Brand Name: XINHE
Place of Origin: China (Mainland)
Processing Type: Toilet Paper roll making machine
Product Type: Toilet Tissue
Condition: New
Forming type: fourdrinier type
Daily output: 10-25tons
Trimmed width: 1500-5600mm

Specifications

Fourdrinier Tissue Machine

 

The CTM Crescent Former tissue machine family, combining the CyberFlow single-layer/multi-layers

hydraulic headbox, the CyberFormer crescent former and the CyberDry steel shell Yankee/cast iron

Yankee, are designed to suit the most critical quality requirements for producing tissue paper grades.

 

Main Technical Data :
Trimmed paper width:1500-5600mm
Capacity:10-25tons
Working speed:200-500m/min
Basis weight:13-40gsm



Features of FTM machine

 

1.High efficiency, low power consumption

2.Save and reduce operating costs.

3.Supplied with the accessories using first class components

4.Applied for various materials, such as virgin pulp, bamboo pulp, bagasse, straw pulp, recycled paper and de-inked pulp, etc.

 

 

Turn-key Projects and Auxiliary Systems 

 

We can integrate the Tissue Machine with a very deep experience in stock preparation supplying projects on 

the Turn-Key basis.

 

The Auxiliary systems that could be included in the projects are:

  • Slitter Rewinder
  • Approach Flow System
  • Steam and Condensate System
  • Vacuum System
  • Compressed Air System
  • Overhead Cranes
  • Electrical Control
  • DCS and QCS
  • Fiber Recovery System
  • Water Treatment System
  • Chemical Dosing System

Stock Preparation including:

  • Deinking Line
  • OCC Line
  • Virgin Pulp Line
  • Broke Line

 

Our Services

 

Our Services

1.Customized projects and complete production lines designed according to customer needs.

2.Modification of existing machines with solutions to satisfy customer needs.

 

After-sale Service 

 

1.The machine will be fully pre-erected at VALTEC workshop with complete on-mahine pre-piping in order

   to minimize mill site erection timing.

2.The machine can be supplied with the accessories using first class components.

3.We shall provide the G.A. drawing, foundation drawing and layout drawing after receiving the advance payment.

4.We have the professional installation team to provide erection/or erection supervision, commissioning,

   test-run and training for customer. The customer shall provide international flight ticket, local transportation

   vehicle, food, hotel accommodations and salary for our engineers.

5.Performance and Mechanical Guarantee shall be provided for 1 year from the successful commissioning

   or 1.5 years from the date of Bill of Lading.