After-sales Service Provided: | Engineers available to service machinery overseas |
---|---|
Warranty: | 12 months |
Certification: | CE,CIQ,QC,SGS,SAI |
Weight: | 1800KG |
Dimension(L*W*H): | 2.45*4.5*1.7m |
Power(W): | 3.0KW |
Voltage: | AC220V-380V/50Hz |
Model Number: | JX-1530FV |
Brand Name: | JIAXIN |
Place of Origin: | China (Mainland) |
CNC or Not: | CNC |
Condition: | New |
Quick Details
Specifications
JX-1530FV JIAXIN 3d wood cnc router /Wood cutting machine price
Model
|
JX-1530
|
X, Y axis working area
|
1500x3000mm
|
Z axis working area
|
350mm
|
Z-axis clearance
|
200mm
|
Repeatability
|
+/-0.025mm
|
Max cutting speed
|
30m/min
|
Max. Traverse Speed
|
56m/min
|
Rapid Traverse
|
45m/min
|
Spindle power
|
3.0KW
|
Spindle rotating speed
|
24000rpm
|
Command
|
G code*. U00*mmg*. Plt
|
Work mode
|
Step motor
|
Voltage
|
AC380V/50HZ
|
Suitable Industry
Suitable in the woodwork industry, plastics industry, insulating materials industry and non-ferrous metals industry and so on.
Performance Characteristics
1.It adopts the high power spindle made in China. Linear square guide.
2.X. Y axis with high precision rack opinion transmission, high speed. Z axis drive: A high-precision ball screw drive with
low coefficient of sliding friction force is small, fast run smooth.
low coefficient of sliding friction force is small, fast run smooth.
3.Table Surface: Vacuum table with 6 vacuum zones.
4.Software: compatible of all CAD/CAM , Type 3 /Artcamsoftware.
Guarantee & aftersale service
Guarantee for one year, 24-hour technical support by email or calling.
User-friendly English manual and Video CD for machine using and maintaining.
Machine details JX-1530
HARDWARE
|
SOFTWARE
|
||||
No.
|
Parts
|
Quantity
|
No.
|
Parts
|
Quantity
|
1
|
Cnc router
(Linear guide way )
|
1 set
|
10
|
DSP control system
|
1 set
|
2
|
Water pump
|
1 set
|
11
|
Type 3 original
|
1pc
|
3
|
cable
|
1 pc
|
12
|
instruction manual
|
1pc
|
4
|
wrench
|
2 pcs
|
13
|
Guarantee card
|
1pc
|
5
|
Clamp
|
6 pcs
|
14
|
User Manual
|
1pc
|
7
|
Power line
|
1 pc
|
|||
8
|
Dust collector
|
1 set
|
|||
9
|
Vacuum pump
|
1set
|
Installation
1.Prepare the installation factors according to instructions, then the engineer will install and test the machine.
2.Construct according to requests in order to have installation conditions.
3.Unload the machine and strip the box.
4.Provide hoisting apparatus and multipurpose tools freely.
5.Send for technicians to install the machine with engineer from Jiaxin.
6.Finish installation and debugging within 3 days.
Package
Package