1.Product specification:
?Model |
XK-18S/side |
|
Electric |
Power |
1.1KW |
Voltage |
220V~240V/50/60Hz |
|
Speed |
12 |
|
Fan system |
Applicable area |
80~120㎡(lower-latitude and moist areas), 100~150㎡ (higher-latitude and arid areas) |
Max.Airflow |
18000m3/h |
|
Fan type |
Axial |
|
Fan blades |
Three Nylon blades |
|
Pressure |
180Pa |
|
Noise |
55~70db |
|
Outer casing |
Material |
PP copolymerization EPC30R-H engineering plastic (100% new material). |
Discharge type |
side |
|
Dimension (mm) |
1060*1080*950 |
|
Packed size ( assembled)mm |
1070*1080*1130 |
|
Loading quantity (assembled) |
20 units/20ft container, 44 units/40 ft container |
|
Loading quantity (SKD) |
36~40 units/20ft container, 94~100 units/40 HQ container |
|
Net weight |
68KGS |
|
Gross weight |
78KGS |
|
Control system |
Wall controller |
LCD control panel |
Remote control |
yes |
|
Manual/Auto-drain |
yes |
|
Overload protect |
yes |
|
Water shortage protection |
yes |
|
Open phase protection |
yes |
|
Undervoltage protection |
yes |
|
Temp.&Humidity display |
yes |
|
Pre-cooling |
Option |
|
Memery Function |
Option |
|
Communication line |
8m |
2.Delivery time:
5-7 working days for 20 feet container
7-10 working days for 40 HQ container
3.Warranty policy:
A.Whole machine are one year.
B.Body case:8 years.
C.Cooling pads:3 years.
D.Motor:2 years.
E.Fan blades:3 years.
F.Other parts are one year
4.FAQS:
A:Can you provide samples?
Of course, not free for samples but samples fees will be returned after a formal order.
B:How long is the delivery time for samples?
1-2 working days.
C:How long is the delivery time for bulk order?
Generally it takes us 7-10 working days to finish the order after receiving deposit.
D:What's the payment term ?
30% deposit by T/T,70% balance before shippment by T/T or L/C at sight.
E:Can we use our own brand?
Yes, OEM and ODM service are accepted, and we could make your own brand on the products.
F:How often do I clean my evaporative cooling pads?
Pads should be cleaned at least once a season prior to storing for the winter. In hard water areas,cleaning may be required more frequently.Periodic ,visual examination is required.Remove the back or top of the cooler following the instructions in the operating manual.Look at the pads,if they show signs of heavy mineral deposits they will need to be cleaned.