Product Main

Quick Details

After-sales Service Provided: Engineers available to service machinery overseas
Model Number: TF
Brand Name: Tianfeng
Place of Origin: China (Mainland)
Condition:: New
Production Capacity:: 2-4.5m/min
Dimension(L*W*H):: 35000mm*2500mm*2600mm
Warranty:: 13 months
color:: blue
The whole power:: about 30kw
Tile Type:: Colored Steel
Power(W):: 30KW
Weight:: 25T
voltage:: 380v

Specifications

Technical parameter:

Description

specification

Main moter power

32kw

Out line dimension of machine

38*2.5*2.5M

Total weight

10t

Processing speed

0-5m/min

The thickness of upper steel plate

0.3-0.8mm

The feeding width of upper steel plate

1000/1200/1250

The thickness of lower steel plate

0.3-0.8mm

The feeding width of upper steel plate

1000/1200/1250

material

EPS

thickness

38-298mm

The width of stocket board

950/1150mm

The width of H board

1000/1200mm

Equipment parts: including roll forming system, PLC control system, hydraulic cutting system, , products supporter, counter

 

Maintenance of roll forming machine

For a roll forming machine, good maintenance is a crucial element to improve machine working efficiency and extend its service life. Following are some tips on machine maintenance: 


Filter

1 each oil change, filters should be replaced or thoroughly cleaned; 
2 air filter of the fuel tank should be checked and cleaned every three months better to be replaced each year.
3 when there is alarm or oil filter is not clean, filter should be replaced; 


Hydraulic components

1 Hydraulic system should be cleaned each month, (including the base board, valve, motor, pump and oil pipe.) to keep dust off, but detergent should not be used.
2 When the new machine has been used for one month, user should check possible deformation of oil pipe and replace the deformed one. When used for two month, all connections of components should be tightened and this should be done after the machine is turn off and there is no system pressure.

 

Hydraulic oil

1 oil level should be checked each week or after repair of hydraulic system. Fill in the hydraulic oil once oil level is below the oil window
2 oil temperature should be between 35 °C ~ 60 °C, shall not exceed 70 °C,if the oil temperature is too high it will lead to deterioration and damage of accessories. 
3 new machine oil change should be conducted after 2000 hours usage, after that, every 4000 ~ 6000 hours of work should change oil, Oil tank should be washed every time oil is changed.