After-sales Service Provided: | Engineers available to service machinery overseas |
---|---|
Warranty: | 1 YEAR |
Certification: | SGS |
Weight: | 30ton |
Dimension(L*W*H): | 9mx4.5mx5.2m |
Power(W): | 325KW |
Voltage: | 220 |
Model Number: | 1000-3 |
Brand Name: | yankang |
Place of Origin: | China (Mainland) |
Automatic: | Yes |
Blow Moulding Type: | Extrusion Blow Moulding |
Application: | WATER TANKS road barriers |
Condition: | New |
Quick Details
Specifications
1.Machine Series
Style Number |
1000L Three Layers Blow Molding Machine(YK1000L-3) |
Type |
3 Layers (Three layers, Three extruders) |
Product range
|
200 L—1000 L water tank |
Material process
|
HDPE/ HMWHDPE |
Output
|
12PC/H for 1000 L water storage tank
|
3.Payment terms
FOB Qingdao port, China
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;
4. Configuration
MOOG |
Japan |
|
PLC |
SEIMENS |
Germany |
Germany |
||
Servo Valve & Servo Transducer |
MIRAN |
Italy |
Inverter |
SEIMENS |
Germany |
Hydraulic Oil Seal |
DZ |
Taiwan |
Intermediate Relay |
OMRON |
Japan |
Pneumatic Valve |
AIRTECH |
Taiwan |
Hydraulic Pump & Valve |
YUKEN |
Japan |
Pneumatic Switch & Contactor |
SEIMENS |
Germany |
Screw Motor |
SEIMENS |
Germany |
Reducer |
GUOMAO |
China |
6. Auxiliary Machinery ( This is excluded in the machine price).
Sr |
Items |
Capacity |
1 |
Air Tank Receiver |
2 M3 |
2 |
Air Compressor |
18.5 KW |
3 |
Chilller |
30 HP |
4 |
Grinder |
15 KW |
5 |
Mixer |
150 KG |
7. Output:
Output |
Unit |
Weight |
Unit |
|
200 L Tank |
20 |
PC/H |
3-4 |
KG |
300 L Tank |
18 |
PC/H |
5-6 |
KG |
500 L Tank |
15 |
PC/H |
9 |
KG |
750 L Tank |
14 |
PC/H |
13 |
KG |
1000 L tank |
12 |
PC/H |
18 |
KG |
8.Delivery Time
4 months after the down payment;
9.Training
The Buyer could send their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician will train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;
The training is free of charge;
10. Installation & Adjustment
The Seller will send an engineer against the requests of the Buyer to install and adjust the machines for one week in the Buyer's factory.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should afford the engineer's visa application cost, round air tickets, and accommodation.
11.Guarantee
The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.