Type: | Other Waterproofing Materials |
---|---|
Model Number: | JSA-101 |
Brand Name: | Yuhong |
Place of Origin: | China (Mainland) |
Quick Details
Specifications
Where to use
· Bathroom, kitchen, floors and balcony;
· Waterproof layers;
· Waterproof constructions under non-permanent immersion environment.
Advantages
· Water-based environmental-friendly coatings;
· High tensile strength with water resistance and weather resistance;
· Can be applied on wet substrates with tight bonding;
· Cold and convenient to apply;
· Waterproofing functions with impermeableness and moisture proofing.
Standards
GB/T23445-2009
Typical properties
Item |
Requirement |
|
Solid content, % ≥ |
70 |
|
Tensile strength, MPa ≥ |
No treatment, MPa ≥ |
1.2 |
Retention rate after heat treatment, % ≥ |
80 |
|
Retention rate after akali treatment, % ≥ |
60 |
|
Retention rate after water immersion, % ≥ |
60 |
|
Retention rate after UV treatment, % ≥ |
80 |
|
Elongation at break, % ≥ |
No treatment, MPa ≥ |
200 |
Heat treatment, % ≥ |
150 |
|
Alkali treatment, % ≥ |
150 |
|
Water immersed treatment, % ≥ |
150 |
|
UV treatment, % ≥ |
150 |
|
Flexibility at low temperature, ° C |
-10° C, no cracks |
|
Boding strength |
No treatment, MPa ≥ |
0.5 |
Wet substrate, MPa ≥ |
0.5 |
|
Alkali treatment, MPa ≥ |
0.5 |
|
Water immersed treatment, MPa ≥ |
0.5 |
|
Water tightness, 0.3MPa, 30min |
Pass |
Packaging
Powder and liquid of JSA-101 is separately packed in 8kg and 10kg plastic bags, sealed in 18kg plastic casks and transported in wooden cases. Each wooden case can be contained 36 casks of JSA-101.
Storage
JSA-101 material should be stored in sealed. Liquid materials should be put in shade places above 5° C. Powder materials should be put in dry places.
Transportation
JSA-101 can be stored for 6 months under normal transport conditions.
Application System
l Constructive System
The system is basically consisted of substrate, additional layer, waterproof coated membrane and protection layer.
l Coverage
2.4kg per m2 gives dft 1mm minimum. Coverage may vary with the substrate condition during application.
l Application Method
Surface preparation
Surfaces should be stable, clean, smooth, without obvious water and free from any dusts, oil or loose particles. Cracks and surface irregularities need to be filled by sealants and do additional waterproofing.
Mixing
Mix powder and liquid of JSA-101 according to the ratio on the package. The amount of water should be properly added to control the stickiness to satisfy the different application requirements for vertical and horizontal surfaces.
Additional layer
Paint JSA coating 2-4 times as additional layer to enhance at internal and external corners, drain pipes, floor drains or embedded parts. It is better to use reinforced materials for basement projects.
Application of waterproof coated membrane
JSA need to be coated at least 4 times. It must be painted again after fully dry. The normal time between each painting is 8 hours or more during winter time. When add reinforced materials, they must be flat without fold. The lapping parts need to be more than 100 mm. Paint JSA before adding reinforced materials, and after adding reinforced materials, JSA coatings must be painted again.
Application of protection layer
After waterproof coated membrane is fully dry and meets quality requirements, it can begin application of protection layer.