Product: | pallet mould |
---|---|
Product Material: | Steel |
Shaping Mode: | Plastic Injection Mould |
Brand Name: | Zhilian Mould |
material: | plastic |
Model Number: | plastic pallet mould |
Place of Origin: | China (Mainland) |
Product: | Plastic pallet mould |
Plastic material: | PP, PC, PS,PVC, ABS |
Mould Material: | 2316, H13, 718, S136, P20 |
Injection Mould running: | Full automaticity |
CNC Machining Tolerance: | 0.003to 0.005mm |
Cavity: | Single/multi |
Gate: | Open gates or valve gates |
Runner system: | YUDO |
Manufacturing machine: | CNC, EDM, Wire-line cutting |
Mould life: | 550000-1000000shots |
Quick Details
Specifications
1. Detailed description of plAstic pallet mould
name | PlAstic pallet mould | |
Mould material | 45# 50# 718 2738 P20 S136 etc | |
Mould design | 3D/2D | |
Design days | 3-5 days | |
Plastic material | PE PC PS PP ABS PVC etc. | |
Injection system | Pin-point gate | |
Payment | 40% advance payment; |
2. MAking process of PlAstic pallet mould
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
Total: It is 50 Days for first mould testing after mold design is confirmed.
3. QUality control ofpLastic pallet mould
1.Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2.Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of pallet mould'S size checking after machining according to 2D drawing
- mould testing(check pallet mould running condition)
3.Check with customer'S requirement again before mold shipping.
4. Packing and shipping of Plastic pallet mould
Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.
Sent together with the mould:
A) Mold manual instruction
B) engineering drawing in
C)one more set of mould spare parts:heater,ejector pin,bush,water nozzle,water pipe,hanging ring.
5. MAintenance of Plastic pallet mould
A)When the mold is vacant, spray the anti-rust oil
B)to clean the gate and cooling system regularly
C)Avoid to use recycled material if the mold is suitable for virgin material only
6. Service of Zhilian Mould
Pre-sale:
Analysing the customer's need with great care
Select the suitable model of machine
Providing perfect solution with accurate machine specification
Sales:
Zhilian Mould will send to buyer the plastic pallet mould schedule and processing report each 10 days.
Zhilian Mould will send the tryout samples for buyer checking and work out improvements requirement.
after-sale:
One year of warranty.
Offering the according parts for free, if any error(not man-made) happens within the period of guarantee.
Offer overseas service if we(the Two Parties) can come to an overseas service agreement.
Post by Alice