| Model Number: | FS-JS516461631 |
|---|---|
| Brand Name: | FOREVER |
| Place of Origin: | China (Mainland) |
| Usage: | Warehouse, Workshop |
| Customized: | Customized |
| Material: | Steel Structure |
| Certification: | ISO, BV, SGS |
Quick Details
Specifications
TECHNICAL DETAILS of Light Steel Structure Buildings:
1. Wind Load, Snow Load, Earthquake and Rainfall
2. Length, Width, Eave Height and Roof Slope
3. Single Floor or Multi-floor
4. Clear Span or Multi-span
5. Requirements on the brick wall
6. Requirements on the roof and wall materials
7. Requirements on the type & quantity of window and door
8. Requirements on the natural lighting & ventilation system
MAIN STEEL PART of Steel Workshop
1. H section steel columns, beams and wind-proof columns
2. With treatment of one time red-oxide primer painting and two times grey facing painting
SECONDARY STEEL PART of Steel Structure Warehouse
1. Roof & Wall C/Z Purlin
2. Tie Bar: φ 89*3.0
3. Roof Support & Support between Columns: φ 20
4. Bracing Bar: φ 12
5. Knee Bracing: Angle Steel
ROOF & WALL CLADDING
1. Roof & Wall Corrugated Single Steel Sheet: 0.3mm-0.6mm
2. Roof & Wall Sandwich Panel Insulated with EPS Foam, Glass wool, Rock wool and PU: 50mm-150mm
3. Transparent Sheet (FRP): 1.0mm-2.0mm
4. Flashings: Made by Color-coated Corrugated Steel Sheet
WINDOW & DOOR
1. Window: PVC Window or Aluminum-alloy Window
2. Door: Sliding Door or Roll-up Door
FASTENERS
High-strength Bolt; Common Bolt and Nut; Self-tapping Screws; Foundation Bolt and Nut, ETC
DELIVERY
1. Lead Time: 30-45 days
2. Loaded in 20GP, 40GP; 40HC; 40OT; 45 HC
3. Package: Standard Package
OTHER OPTIONAL ACCESSORIES
1. Gutter
2. Downpipe
3. Brick Wall: The height of brick wall is depended on client's need
4. Ventilation System
5. Lifting Height of Crane: >6m
6. Lifting Weight of Crane: 3-30T
PAYMENT TERMS
1.30% T/T before production; The balance before shipment
1. Wind Load, Snow Load, Earthquake and Rainfall
2. Length, Width, Eave Height and Roof Slope
3. Single Floor or Multi-floor
4. Clear Span or Multi-span
5. Requirements on the brick wall
6. Requirements on the roof and wall materials
7. Requirements on the type & quantity of window and door
8. Requirements on the natural lighting & ventilation system
MAIN STEEL PART of Steel Workshop
1. H section steel columns, beams and wind-proof columns
2. With treatment of one time red-oxide primer painting and two times grey facing painting
SECONDARY STEEL PART of Steel Structure Warehouse
1. Roof & Wall C/Z Purlin
2. Tie Bar: φ 89*3.0
3. Roof Support & Support between Columns: φ 20
4. Bracing Bar: φ 12
5. Knee Bracing: Angle Steel
ROOF & WALL CLADDING
1. Roof & Wall Corrugated Single Steel Sheet: 0.3mm-0.6mm
2. Roof & Wall Sandwich Panel Insulated with EPS Foam, Glass wool, Rock wool and PU: 50mm-150mm
3. Transparent Sheet (FRP): 1.0mm-2.0mm
4. Flashings: Made by Color-coated Corrugated Steel Sheet
WINDOW & DOOR
1. Window: PVC Window or Aluminum-alloy Window
2. Door: Sliding Door or Roll-up Door
FASTENERS
High-strength Bolt; Common Bolt and Nut; Self-tapping Screws; Foundation Bolt and Nut, ETC
DELIVERY
1. Lead Time: 30-45 days
2. Loaded in 20GP, 40GP; 40HC; 40OT; 45 HC
3. Package: Standard Package
OTHER OPTIONAL ACCESSORIES
1. Gutter
2. Downpipe
3. Brick Wall: The height of brick wall is depended on client's need
4. Ventilation System
5. Lifting Height of Crane: >6m
6. Lifting Weight of Crane: 3-30T
PAYMENT TERMS
1.30% T/T before production; The balance before shipment

