Theory: | Magnetic Reed Switch |
---|---|
Material: | Stainless Steel 304/316 |
Application: | Level Sensor |
Operating Temperature: | -30~+200C |
Max. Voltage: | 220VDC |
Max. Current: | 1.5A |
Protection Level: | IP65 |
Cable wire: | Customizable |
Certificate: | CE RoHs |
Place of Origin: | Dongguan, China |
Quick Details
Specifications
Our advantages:
1. Our raw materials passed UL and SGS, quality is reliable and stable.
2. All kinds of float ball materials and sizes for your choice.
3. We can customize specification as your requirements. Welcome OEM or ODM.
4. Small MOQ: 100pcs
5. Short lead time: 7-10days
1.Operation Principle:
The working principle of the float level switch is direct and simple, usually set a point or a few points of Reed Switch in a sealed non-magnetic metal or engineering plastic tube.
And then fix the float ball with magnetic system built-in in the position of reed switch which in the tube body, letting the float fluctuate within a certain range. Using of the magnetic system of the float ball, activate the reed switch to open or close through the tubebody. In the result of producing switching action and control the level.
2.Application:
Float level switches are widely used in electronic, electrical, chemical, water treatment, drainage and other industry of level control and alarm.
3.Characteristic:
1.Acid and alkali resistant materials: PP, PVDF, NYLON, NBR etc..
2.Stainless steel SUS304, SUS316, max working temp. 200℃, max proof pressure 60kg/cm 2
3.PP switch body length can reach 120mm~400mm, the length can be adjusted according to your water tank, switch body is durability.
4.Multiple wires: electrical wire or cable wire, PVC, XLPE, PTFE materials.
5.Multiple installations, dimensions, from M8~M16, 1/8" ~ 1/2",PF/PT/BSP etc..
Payment:
We usually accept T/T(with 30% deposit, the balance before shipment); Western Union; PayPal
How to make an order?
1.Sample approval
2.A. Big order: Client make 30% deposit after receiving our PI .
B. Sample & Small order: Client make 100% payment via Western Union or Paypal
3.Client approve our sample, and get the testing report if any necessary
4.Production
5.Client approve our shipping sample
6.Arrange shipment
7.Supplier arrange necessary documents and send copy of these documents
8.Client finish the balance payments
9.Supplier send original documents or telex release the goods