| Type: | Briquette Machines |
|---|---|
| After-sales Service Provided: | Engineers available to service machinery overseas |
| Warranty: | 12month |
| Certification: | CE & ISO |
| Model Number: | TF-180 |
| Brand Name: | FuYu |
| Place of Origin: | China (Mainland) |
| Power(W): | 18.5-22 |
| Production Capacity: | 2-3t/h |
| Condition: | New |
| Model: | TF-180 |
| Capacity: | 2-3t/h |
| Packing: | 40 |
Quick Details
Specifications
Working Principle
Coal rods machine is a machine tool for the different shape of the powder coal. Its working principle is: the motor through the triangle belt transmission to the transmission, the transmission output shaft through the floating coupling to push the propulsion shaft, the propulsion shaft to promote the coal feed through the forming die, and then give birth to an ideal high pressure coal rod.
Structure Features
1.The feed screw leads to large, feed into the material quickly, and promote the small, the province power.
2.Shaft block with the use of rigid connection, high degree of resistance, anti - thrust, machine stability
3.The need to seal the use of fault structure, the dirt from the fault
4.Triangle belt drive, smooth operation, low noise, and its overload protection
5.The head and cylinder are connected with the card ring structure and the structure of the bolt.
Installation and Commissioning
1. The installation of spare parts must be thoroughly cleaned, removal of the transport or storage of a long time of rust, and check the parts are not damaged.
2. Based on the diagram on the basis of concrete pouring, and concrete screw, after the solidification of the coal rod machine dipping in concrete based on screw alignment, two concrete grouting, anchor bolts to be solidified, correct the machine level, the machine can be stable test machine.
3. Before the test machine will be the lubrication of lubrication, oil content is moderate. Check all the bolts if there is a loose phenomenon, and tighten. Point to move the machine to see if there is a foreign body or abnormal sound. All confirmed that no party can start running. And check the power direction is correct.
4. The machine idle for 3~5 minutes, then all the normal feeding trial, new machine feeding should be uniform, moderate (wet and dry water generally contain 12%~15%).
Technical Parameters
Model: TF-180
Capacity: 2-3t/h
Molding Specification: Dia20-60
Spindle Speed: 39-60Rev/min
Helical Blade Number: 4
Electric Machinery: 18.5kw, 22kw
Reducer: ZQ400
Bearing: 7511,211,210,1305
Remarks: The spindle speed is the lowest speed, according to the current size of the load weight. Yield increase.
Coal rods machine is a machine tool for the different shape of the powder coal. Its working principle is: the motor through the triangle belt transmission to the transmission, the transmission output shaft through the floating coupling to push the propulsion shaft, the propulsion shaft to promote the coal feed through the forming die, and then give birth to an ideal high pressure coal rod.
Structure Features
1.The feed screw leads to large, feed into the material quickly, and promote the small, the province power.
2.Shaft block with the use of rigid connection, high degree of resistance, anti - thrust, machine stability
3.The need to seal the use of fault structure, the dirt from the fault
4.Triangle belt drive, smooth operation, low noise, and its overload protection
5.The head and cylinder are connected with the card ring structure and the structure of the bolt.
Installation and Commissioning
1. The installation of spare parts must be thoroughly cleaned, removal of the transport or storage of a long time of rust, and check the parts are not damaged.
2. Based on the diagram on the basis of concrete pouring, and concrete screw, after the solidification of the coal rod machine dipping in concrete based on screw alignment, two concrete grouting, anchor bolts to be solidified, correct the machine level, the machine can be stable test machine.
3. Before the test machine will be the lubrication of lubrication, oil content is moderate. Check all the bolts if there is a loose phenomenon, and tighten. Point to move the machine to see if there is a foreign body or abnormal sound. All confirmed that no party can start running. And check the power direction is correct.
4. The machine idle for 3~5 minutes, then all the normal feeding trial, new machine feeding should be uniform, moderate (wet and dry water generally contain 12%~15%).
Technical Parameters
Model: TF-180
Capacity: 2-3t/h
Molding Specification: Dia20-60
Spindle Speed: 39-60Rev/min
Helical Blade Number: 4
Electric Machinery: 18.5kw, 22kw
Reducer: ZQ400
Bearing: 7511,211,210,1305
Remarks: The spindle speed is the lowest speed, according to the current size of the load weight. Yield increase.

