Product Main

Quick Details

Brand Name: jiuzhou
Place of Origin: China (Mainland)

Specifications

The  includes supporting steel pipes, pipe supports, pull bars, a beam.etc.

Installed on the slewing supporting holder, the main beam frame can rotate 360°. Pipe supports on the front beam are used to fix and support delivery pipelines. The balancing frame on the rear beam is installed to achieve the balance.

The Manual Concrete Placing Boom series is structurally stable and reliable, operationally portable and flexible.

 

 Model

HGS-10

HGS-12

HGS-15

HGS-18

Reach, m

10

12

15

18

Area, 

260

450

600

1000

Height, m

4

4

4.5

5

Pipeline Dia., m

133*4.5

133*4.5

133*4.5

133*4.5

Overall Weight, kg

900

1000

1200

1500

Arm A Rotation, °

360

360

360

360

Arm B Rotation, °

350

350

350

350

Operating Weight, kg

500

650

800

1000